BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2022 at 8:00 PM

Updated September 15, 2023

Site work, paving and renovation of a mixed-use development in Fredericton, New Brunswick. Completed plans call for the renovation of a educational facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

* The bid results are as follows: CNF Mallet Ltee - $1,013,150.000 Option A 987,850.00; Philson Ltd. - $1,079,045.00 Option A 1,030,745.00. This contract includes the supply of all plant, labour, materials, equipment, and supervision necessary to complete the project. The work under this contract includes, but is not necessarily limited to, the following (see Drawings and Specifications): 1. Construction of new access road to east side of plant complete with granulars and asphalt paving. 2. Construction of parking area to the north side of plant complete with granular sub-base. 3. Construction of new underground services (sanitary and storm) and relocation of existing services to prepare for future building expansion. 4. Installation of new Oil Water Separator and related piping including the removal of the existing OWS. 5. Re-routing of plumbing within Bunker Pump House. 6. Installation of new electrical to support new OWS. The project shall be completed by September 2, 2022. Site is available on June 13, 2022. Work shall also be scheduled to minimize disruption. The successful contractor shall provide a schedule showing continuous work from commencement to completion of the project. A security deposit in the form of a Bid Bond or Certified Cheque in the amount of 10% of the total tendered price must accompany your Tender submission. All questions for the entirety of this tender process are to be directed to Craig Hickey, Director of Projects, Capital Planning & Operations, via the Bonfire Portal. Documents may be obtained through UNB's online Bonfire portal at https://unb.bonfirehub.ca/opportunities/52275

Bid Results

Sidewalks / Parking Lot

$1,013,150.00

Public - State/Provincial

Paving, Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

June 13, 2022

Project location map

950 College Hill Rd, Fredericton, NB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.