BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Banff, Alberta. Completed plans call for site work for a playground / park / athletic field.

Banff Recreation Grounds Redevelopment - Trails. A network of trails throughout the Banff Recreation Grounds totaling an approximate length of 1,320m (plus 145m provisional) organized in sub-projects per the following Unit Rate Schedules: Schedule A - General Provisions Schedule B - Central Trail Schedule C - Maintenance Trail Schedule D - West Trail Schedule E - North Trail Schedule F - PROVISIONAL - Central Horse Trail Schedule G - Jasper to Cave Trail Work of this Contract comprises the following: .1 CASH ALLOWANCE: Collaboration and support to Owner (Town of Banff) to obtain approval of an Environmental Protection Plan (EPP) from Parks Canada. Refer to DRAFT EPP attachment for more information. .2 Mobilization (including signage and construction fencing as needed for public safety) and Demobilization. .3 Demolition including: demolition and disposal existing elements. excavation and disposal of existing excavated materials. salvage / storage / reinstallation of existing elements. .4 Tree Removals, Stump Removals, Clearing and Grubbing (including stump grinding). .5 Earthworks including rough and fine grading, exported fill material, imported raw loam, over excavation and disposal of unsuitable subgrade (contingent item) and common fill to replace unsuitable subgrade (contingent item). .6 Soft Landscape Construction including seeding. .7 Hard Landscape Construction including asphalt pathways, granular pedestrian trails, granular horse trails, wood edgers, culvert crossings, concrete curb and vertical root barrier. .8 Specific to Jasper to Cave Trail (drawings and specifications by WSP): trail cutting, earthworks, gravel trail, stack stone retaining wall, seeding, planting (trees, shrubs and perennials), bark mulch and a post and rail fence. .9 For all sub-projects: Maintenance for all seeded areas until establishment / FAC. .10 For al sub-projects: Red-lined as-built drawing creation.

Post-Bid

Playgrounds / Parks / Athletic Fields

$150,000.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
24
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2022

May 30, 2022

img_map_placeholder

Multiple Locations, Banff, AB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.