Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Banff, Alberta. Completed plans call for site work for a playground / park / athletic field.
Banff Recreation Grounds Redevelopment - Trails. A network of trails throughout the Banff Recreation Grounds totaling an approximate length of 1,320m (plus 145m provisional) organized in sub-projects per the following Unit Rate Schedules: Schedule A - General Provisions Schedule B - Central Trail Schedule C - Maintenance Trail Schedule D - West Trail Schedule E - North Trail Schedule F - PROVISIONAL - Central Horse Trail Schedule G - Jasper to Cave Trail Work of this Contract comprises the following: .1 CASH ALLOWANCE: Collaboration and support to Owner (Town of Banff) to obtain approval of an Environmental Protection Plan (EPP) from Parks Canada. Refer to DRAFT EPP attachment for more information. .2 Mobilization (including signage and construction fencing as needed for public safety) and Demobilization. .3 Demolition including: demolition and disposal existing elements. excavation and disposal of existing excavated materials. salvage / storage / reinstallation of existing elements. .4 Tree Removals, Stump Removals, Clearing and Grubbing (including stump grinding). .5 Earthworks including rough and fine grading, exported fill material, imported raw loam, over excavation and disposal of unsuitable subgrade (contingent item) and common fill to replace unsuitable subgrade (contingent item). .6 Soft Landscape Construction including seeding. .7 Hard Landscape Construction including asphalt pathways, granular pedestrian trails, granular horse trails, wood edgers, culvert crossings, concrete curb and vertical root barrier. .8 Specific to Jasper to Cave Trail (drawings and specifications by WSP): trail cutting, earthworks, gravel trail, stack stone retaining wall, seeding, planting (trees, shrubs and perennials), bark mulch and a post and rail fence. .9 For all sub-projects: Maintenance for all seeded areas until establishment / FAC. .10 For al sub-projects: Red-lined as-built drawing creation.
Post-Bid
Playgrounds / Parks / Athletic Fields
$150,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2022
May 30, 2022
Multiple Locations, Banff, AB
Related To This Project
Banff, AB
Bid Date: Mar 25 2022
Banff, AB
Bid Date: Apr 01 2021
Banff, AB
Bid Date: Jun 06 2022
Banff, AB
Bid Date: May 05 2022
Banff, AB
Bid Date: May 19 2022
Banff, AB
Bid Date: May 25 2022
Banff, AB
Bid Date: Mar 03 2022
Banff, AB
--
Banff, AB
Bid Date: Apr 25 2022
Banff, AB
Bid Date: Apr 19 2022
Banff, AB
Bid Date: Mar 29 2022
Banff, AB
Bid Date: Apr 05 2022
Banff, AB
Bid Date: Jan 29 2021
Banff, AB
Bid Date: Dec 23 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.