BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Crescent City, California. Contact the soliciting agency for additional information.

The City of Crescent City, California, (City) is requesting statements of qualifications (SOQ) that will lead to the selection of a qualified consultant or consultant team that will provide engineering design and construction management services for Phase 1 of the 2021 Beachfront Park Master Plan (Project), environmental review, permitting, bid package preparation and related services. This Request for Qualifications (RFQ) describes the scope of services, consultant selection process, and mandatory information that must be included in response to this RFQ. The RFQ process is intended to establish the most qualified Consultant(s) who will then enter into a professional services agreement (Contract), the form of which is included as Attachment 1. The Contract will include services required to complete the scope of work identified within this RFQ for the Citys awarded prop 68 Statewide and Per Capita grant projects. Contract compensation will be based upon time and material with a maximum negotiated not-to-exceed As additional funds are granted or allocated to expand the Project, then the Consultants scope of services may increase to include additional Beachfront Park Master Plan elements. The City currently has two such grant applications submitted. One for the design and construction of an amphitheater and waterfront plaza and the other to enhance the Tolowa Cultural Interpretive Area experience. Although this work is not yet funded, the consultants proposal should include a project approach and team to design these features. This work will be considered phase 2 of the project and should not be included in the cost proposal. If the City is awarded funding, the fees for this phase will be negotiated at a later date. Deadline for submitting questions 4/29/22 The method of contractor selection has not been determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
7
Bidding Soon
128
All Active Projects
62
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 16, 2022

img_map_placeholder

To Be Determined, Crescent City, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.