Site work and new construction of a warehouse / distribution facility in Manteca, California. Working plans call for the construction of a 5,600-square-foot warehouse / distribution facility.

The Project is located at San Joaquin Delta College, Manteca Center, 5298 Brunswick Road, Manteca, CA 95336 and consists of the construction of a 40' x 140' equipment storage building with six (6) 23' 4" bays, 35' column span, 16' at the eave with 1.5:12 pitch coved on one (1) 35' west end wall; and 140' south side wall, 5' overhang on the north open side. See attached Bid documents for full scope of services. All questions must be submitted via the District's secure online bidding system, Planet Bids by 5:00 p.m. on Friday, April 22, 2022. Last day for District to issue Addendum is on May 4, 2022 Project Duration: 60 Calendar Days Liquidated Damages: $2,000.00 Per Calendar Day Engineer's Estimated Cost: $0 to $377,000 Pre-Qualification for Bidders: Not Required This Project consists of the construction of a 40' x 140' equipment storage building with six (6) 23' 4" bays, 35' column span, 16' at the eave with 1.5:12 pitch coved on one (1) 35' west end wall; and 140' south side wall, 5' overhang on the north open side. (16) H.D. RECONDITIONED PIPE COLUMNS (7) 40' STEEL I-BEAM RAFTERS (CAPPED) (14) TOP WELD PLATES & GUSSETS (1) LOT GALVANIZED PURLINS & GIRTS GALVANIZED PURLIN/GUTTER COMBO DOWN SPOUTS WITH BRACKETS 26 GA. G90 GALVANIZED ROOF SHEETING 26 GA. PAINTED BLUE SIDE SHEETING (1) LOT GASKETED ROOF & STITCH SCREWS PURLIN & GIRT CLIPS WITH ATTACHMENT 26 GA. G90 GALVANIZED DFRC FORMED RIDGE CAP PAINTED BLUE RAKE TRIM & CORNER CAP (1) 40' X 140' GRADED COMPACTED BUILDING PAD (1) PROVIDE & PLACE 2" OF 3/4 " CRUSHED ROCK (16) CONCRETE PIER FOOTINGS WITH REBAR (1) 10" X 12" X 175' CONCRETE CURB WITH REBAR (175) L.F. GALVANIZED BASE ANGLE WITH ANCHORS PRIMER PAINT ALL COLUMNS & RAFTERS REMOVE 140 L.F. OF EXISTING CHAIN LINK FENCING PROVIDE & INSTALL (2) GALVANIZED POSTS & RECONNECT WIRE STAMPED ENGINEERED PLANS & CALCULATIONS FOR BUILDING & FOOTING DESIGN

Final Planning

Warehouse / Distribution

$377,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
95
Bidding Soon
1,974
All Active Projects
804
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2022

June 9, 2022

img_map_placeholder

5298 Brunswick Rd, Manteca, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.