BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Celina, Texas. Completed plans call for site work for a road / highway.

Grading Improvements for The Punk Carter Parkway Extension in the Light Farms Project. The Punk Carter Parkway Extension work consists of approximately 4,900 CY of Excavation, 1,800 Sq. Yds. of pavement demolition, removal of temporary signage and barricades, Traffic Control, SWPPP and Erosion Control Measures and related work in the Light Farms Master Planned Community in Celina, Collin County, TX. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% percent of Bidder's maximum Bid price and in the form of a certified check, bank money order, or a Bid bond (on the form attached) issued by a surety meeting the requirements The Owner reserves the right to reject any and/or all bids and waive any and/or all informalities. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened Please join my meeting from your computer, tablet or smartphone. https://meet.goto.com/543505005 You can also dial in using your phone. (For supported devices, tap a one-touch number below to join instantly.) United States (Toll Free): 1 866 899 4679 - One-touch: tel:+18668994679,,543505005# United States: +1 (571) 317-3116 - One-touch: tel:+15713173116,,543505005# Access Code: 543-505-005 Join from a video-conferencing room or system. Dial in or type: 67.217.95.2 or inroomlink.goto.com Meeting ID: 543 505 005 Or dial directly: 543505005@67.217.95.2 or 67.217.95.2##543505005

Bid Results

Roads / Highways

$291,526.00

Public - County

Site Work

53

23

4

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
66
Bidding Soon
3,516
All Active Projects
1,398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

June 15, 2022

img_map_placeholder

Punk Carter Pkwy, Celina, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.