BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated February 28, 2024

Site work, paving and outdoor lighting for a civil project in Celina, Texas. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

PN-24522 Paving Improvements for The Punk Carter Parkway Extension in the Light Farms Project. The Punk Carter Parkway Extension work consists of approximately 7,255 SY of 7" & 10" Concrete Pavement, 8,000 Sq. Yds. of Subgrade Preparation, 179 Tons of Hydrated Lime Material, Road Striping and Signage, Street Light Conduit Design and Installation, Traffic Control, and Erosion Control Measures and related work in the Light Farms Master Planned Community in Celina, Collin County, TX.

Bid Results

Roads / Highways

$994,272.00

Public - County

Outdoor Lighting, Paving, Site Work

55

21

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
176
Bidding Soon
3,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

July 5, 2022

Project location map

Punk Carter Pkwy, Celina, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.