BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Mukwonago, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of August 2, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023. *The closed solicitation has been included below for reference: Project Name WALES - HARTFORD Route STH 083N County 67 - Waukesha County Limit PERKINS ROAD TO GLACIER PASS The pavement needs treatment to extend its service life. Perpetuation project to resurface STH 83 approximately 3 miles in length from Perkins Road to Glacier Pass within the Village of Wales in Waukesha County. Anticipated to be 2" mill and HMA replacement. Additional resurfacing work on USH 18 from Moraine View Dr. through STH 83 roundabout to about 670 ft east of roundabout. Existing curb ramps will be evaluated for compliance. Two structures (B67-0317 and B-67-0329) along STH 83 will receive deck sealing Anticipated Construction Cost: $2,000,000-$2,999,999 The contract price will be based on the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). ; Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. The Department will negotiate 1 one-year contract with the option for 2 one-year renewals. Do not include any information that meets the definition of "trade secret" as that term is defined in s. 134.90(1)(c), Wis. Stats. The method of contractor selection has not been determined at this time. Wis DOT - SE-01 RFP Engineering - Perpetuation- Resurfacing STH 83 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Roads / Highways

$3,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
484
Active Projects
193
Bidding Soon
3,121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 4, 2023

Project location map

WI-83, Mukwonago, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.