BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a mixed-use development in Guilford, Vermont. Completed plans call for the renovation of a educational facility.

Windham Southeast School District invites contractors to bid on unit ventilator renovations to Guilford Elementary School and Academy School. General work includes the demolition and replacement of (17) seventeen DDC ready unit ventilators. Please contact Daniel W. Dupras at Engineering Services of VT, LLC, 1-802-855-8091. Windham Southeast School District invites contractors to bid on the renovations to the following existing buildings. In general the work includes: a. Academy School i. Demolition and Replacement of (10) ten unit ventilators, ii. Modify existing heating piping including new pipe insulation and repair of existing heating pipe insulation. iii. Modify existing cabinets and counters as necessary to install replacement units. iv. Verify water and air flow balancing after work is complete. v. Installation of split system cooling units and refrigerant piping for (2) two units serving the auditorium. vi. All units shall be provided with DDC ready IP based BACnet controllers that will be integrated into the DDC control system under a separate contract. vii. This contractor shall install three-way control valves provided by owner. viii. Replace existing heating pumps P1 and P2. ix. Remove and replace existing AHU-3 three-way heating valve with twoway modulating valve. b. Guilford School i. Demolition and Replacement of (7) seven unit ventilators, ii. Modify existing heating piping including new pipe insulation and repair of existing heating pipe insulation. iii. Modify existing cabinets and counters as necessary to install replacement units. iv. Verify water and air flow balancing after work is complete. v. All units shall be provided with DDC ready IP based BACnet controllers that will be integrated into the DDC control system under a separate contract. vi. This contractor shall install three-way control valves provided by

Award

Educational

$600,848.00

Public - County

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
420
Active Projects
184
Bidding Soon
3,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2022

June 13, 2022

Project location map

Multiple Locations, Guilford, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.