BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Guilford, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The location is on Town Highway 4, known as Weatherhead Hollow Road, from approximately the intersection of Town Highway 35, known as Yeaw Road, heading south to approximately Town Highway 48, known as Baker Cross Road and is approximately 2 miles long. The ending location may be adjusted based on the awarded price per ton cost as each project has a monetary limit. The project consists of milled and tapered starting and stopping points and ending project tapers, (a full-width shim of 1 inch and an overlay with 1 inch of 50 Gyration Superpave mix design with 70-28 PG binder) of full virgin material mix. 1" full lane width shim; paving; single lift paving; and shoulder work with 3/4 " dense grade. Project completion is to be no later than 30 September 2023. No paving will be completed after 15 October 2023 without prior written consent of Dan Zumbruski, Guilford Highway Commissioner. The Town of Guilford is not legally obliged to select the lowest bid and reserves the right to select the contractor deemed to best perform this work and fulfill the interests of the Town.

Award

Roads / Highways

$313,038.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
204
Bidding Soon
3,131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2023

June 19, 2023

Project location map

Weatherhead Hollow Rd, Guilford, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.