BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Aurora, Colorado. Completed plans call for the renovation of a military facility.

The Colorado Army National Guard (COARNG) is renovating Building 1000 located on Buckley Space Force Base. The majority of the project consists of lead remediation and replacement of HVAC and lighting throughout the facility. Other project elements include removal and replacement of all ceiling tile and grid, replace light fixtures and add lighting controls, painting and patching of walls, remove and replace flooring, grinding and polishing concrete floors, and adding HVAC controls Construction Schedule: 300 calendar days from Notice to Proceed to Substantial Completion 30 calendar days for completion of punch list items, warranties, etc. 330 calendar days total construction period Date Email Questions Due July 28, 2022 by 4:00PM Date Email Answers Issued August 3, 2022 by 4:00PM Minimum Requirements Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. To be considered as qualified, interested firms shall have, as a minimum: 1. Provided General Contracting services within the last three (3) years for at least two (2) projects each in excess of $2,500,000.00 (hard costs), utilizing the expertise present in their Colorado Office; and 2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and 3. Demonstrated bonding capability up to $3,000,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity. DMVA staff will only be available to assist with access until 9:45AM. If you arrive after staff has left you will not be able to attend. Settlement Notice For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C .R.S. 38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation. Per C.R.S. 24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

Award

Military

$3,585,596.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
39
Bidding Soon
982
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2022

October 24, 2022

img_map_placeholder

19070 East Sunlight Way, Aurora, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.