Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 12, 2022

June 13, 2022

July 13, 2022

Post-Bid

Multi-Residential

$300,000.00

Public - City

img_map_placeholder

1302 Ferris Ct, Pittsburgh, PA

Subscribe to View Full Documents

Renovation of a multi-residential development in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a multi-residential development.

The Scope of Work Area includes but is not limited to selective demolition and restoration on the interior and exterior of the existing unit. The unit is unoccupied. The project shall be bid as s Single Prime. General Prime Contractor: The Scope of Work includes but shall not be limited to structural repair and restoration of existing window, masonry, gypsum board systems and finishes previously damaged by an automobile. All work necessary to complete the repairs shall be reflected in the General Contractor's bid. Electrical Prime Contractor: The Scope of Work includes but shall not be limited to miscellaneous electrical wiring in support of the General Construction. Cost shall be included in the General Contractor's bid. Plumbing Prime Contractor: The Scope of Work includes but shall not be limited to miscellaneous plumbing work in support of the General Construction. Cost shall be included in the General Contractor's bid. Demolition and Construction Phasing Occupant Disruption Schedule (DCPOD Schedule) shall be provided by each Contractor/Discipline to the General Prime Contractor within 14 calendar days from Notice to Proceed. For more information or questions, please contact Samantha Tirk @ 412- 456-5000 x 2900 or Samantha.Tirk@HACP.org Performance bonds are means to ensure that the contract is successfully completed. A performance bond on the part of the contractor for 100 percent of the contract price is required The Payment bond is a method of ensuring that the contractor pays the subcontractors and suppliers. A payment bond on the part of the contractor for 100 percent of the contract price HACP reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of furniture and limited occupancy shall not constitute acceptance of the total Work. If necessary, Architect will request additional information or documentation for evaluation within one week of receipt of an "Equal" product request. Architect will notify Contractor of approval or rejection of proposed "Equal" product request within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
283
Active Projects
150
Bidding Soon

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.