Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2022

June 16, 2022

August 8, 2022

Bid Results

Municipal

$16,000.00

Public - County

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Demolition and site work for a municipal facility in Pittsburgh, Pennsylvania. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Work includes complete demolition of below listed structures; off-site disposal; backfilling; asbestos removal, if applicable; all utilities to be terminated and capped, as needed; pest control; site restoration and other ancillary items, A. Carnegie Borough - 425 Elk Avenue, 15106 Make $50.00 check payable to KLH Engineers. A Labor and Materials Payment Bond, Performance Bond and Maintenance Bond in the amount of 100% of the bid amount will be required. Certificates of Insurance in the amounts specified, as well as Certificate of Worker's Compensation; Explosion, Underground Damage and Collapse Insurance Certificate must be filed with the executed Agreement. The Char-West COG reserves the right to reject any and all bids in whole or in part and to waive any informalities. Bids must be accompanied by a Bid Bond or a certified check made payable, without condition, to the Char- West COG in an amount no less than 10% of the bid or a certified check in the same amount. All recipients of funds must have a U.E.I. number and CAGE CODE as a result in filing with sam.gov. Compliance is required with the Pennsylvania Prevailing Wage Act of 1961, P.L. 987, No. 442; Title VI and other applicable provisions of the Civil Rights Act of 1964; the Department of Labor Equal Opportunity Clause (41 CFR 60 - 1.4); Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with Section 504 of Rehabilitation Act of 1973 and Americans with Disabilities Act of 1990; the Allegheny County MBE/WBE Program enacted July, 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance # 6867-12, setting forth goals of 5 percent Veteran-Owned Small Businesses Any questions may be directed to Michele Lutz, at the Char-West COG, (412) 279-3333 or mlutz@cwcog.com. DESCRIPTION A. 01571-1 467/2022-02 Copyright (C)2022 KLH Engineers, Inc. All Rights Reserved Worldwide The CONTRACTORS shall conduct their activities and shall program trenching and restoration operations in compliance with the Commonwealth of Pennsylvania, Title 25 (Clean Stream Law) Chapter 102 (Erosion and Sediment Control Rules & Regulations) and any rules and regulations by Federal, State, County and/or Municipal law or organization in such a manner as to minimize pollution of the creeks from erosion of the freshly excavated and/or backfilled materials during periods of excavation and surface water runoff. CONTRACTORS shall reduce the area and duration of exposure of all erodible soils by the greatest extent practicable and to that end, hydromulching, reseeding and other specified surface restoration shall be required to closely follow backfilling operations. The type of seeding/ restoration required for the various job locations is listed in the Contract Documents. Where the Contract Documents call for runoff devices or the OWNER'S Representative so directs additional installation of controls in the field, such as silt fence, filter fabric socks, water bars, sediment traps, and/or other means to retard runoff rates shall be installed as specified. Installation of a Pumped Discharge Sediment Trap ("filter bag") or other approved sediment trap arrangements shall also be required to be installed at the discharge of dewatering pumps as detailed in the Contract Documents. Discretion shall be exercised in encroachments during the construction both in and along the creeks such that a minimum of stream disturbance and erosion pollution results. The Soil Erosion and Sediment Pollution Controls deemed as adequate or as approved by the County Soils Conservation Service and the Pennsylvania Department of Environmental Protection are identified in the contract drawings. The CONTRACTOR shall be responsible for all fines, fees, penalties, and subsequent obligations related to violations, etc. imposed upon the OWNER as a result of the CONTRACTOR's construction activities, methods/procedures and/or the lack of construction activities methods/procedures. Multiple Locations Are Available In This Project.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
287
Active Projects
154
Bidding Soon

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.