BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2022 at 8:00 PM

Updated October 25, 2023

Site work for a road / highway in San Carlos, California. Completed plans call for site work for a road / highway.

No Pre-Bid meeting has been scheduled for this project. The scope of work generally includes mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, pedestrian hybrid beacon system installation, loop detectors, striping removal, replacement & installation and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer. Bids are required for the entire work described herein in accordance with the instructions to bidders. The Engineer's Estimate is between $325,000 and $420,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bids must be accompanied by a Proposal guarantee amounting to ten (10%) percent of the bid as described in the specifications. Said guarantee shall be forfeited to the City in case the bidder depositing the same does not, within fifteen days after written notice that the contract has been awarded to him (1) enter into a contract with the City and (2) furnish Performance and Payment Bonds as described in the specifications. The City Council reserves the privilege of rejecting any and all proposals or to waive any irregularities or informalities in any proposals or in the bidding. No bidder may withdraw his proposal for a period of ninety (90) calendar days after the date set for opening of proposals.

Award

Roads / Highways

$345,652.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
197
Bidding Soon
2,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

June 23, 2022

Project location map

El Camino Real & Belmont Ave, San Carlos, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.