BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for an educational facility in Anthony, New Mexico. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

The Board of Education reserves the right to reject any or all bids. The Board of Education reserves the right to reject any or all bids. Contractor shall be required to complete the project on or before the dates set forth in the completion date under Project Schedule of this project manual to avoid liquidated damages. Contractor is liable for and shall pay for or have deducted from funds owed liquidated damages the sum of five-hundred dollars ($500.00) per day plus Consultant and/or air monitoring cost per day for each and every calendar day of delay until the work is substantially completed. Any waivers to liquidated damage amount shall be in writing from the Owner. The work consists of furnishing all plant, labor and materials (except as indicated otherwise in specifications) and performing all work in strict accordance with the plans and specs forAsbestos Removal at the Anthony Elementary Pre-K School - Old Security Building at 609 Church Street in Anthony, New Mexico. Work shall include but not be limited to: preparation for the abatement process, asbestos removal flooring materials, and decontamination from areas shown, disposal, encapsulation under modified containment method, OSHA air monitoring and ambient air sampling. Where there is a conflict of applicable laws or this specification, Contractor shall immediately notify Owner or his representative the owners representation the industrial hygienist (IH). Remove asbestos containing materials from areas described in the Scope of Work, Drawings, Project Manual and any addendum. Contractor shall ensure that no individual is exposed to asbestos or fiberglass fibers contamination in excess of levels shown in these specifications. Contractor shall ensure that no asbestos contamination occurs outside any containment erected by Contractor. Contractor shall ensure that all asbestos waste is disposed of in accordance to these specification and all applicable laws. Contractor shall document all activities pertaining to this project in accordance with these specifications and all applicable laws. Contractor shall ensure that all special precautions, as stated in these documents, have been taken to protect cooling and heating systems, existing electrical equipment, and communication, security, fire, computer systems. Contractor shall ensure that the performance ofthis project does not interfere with the normal operations of all the tenants in the building. Gadsden Independent School District Anthony Elementary Pre-K 1.02 Project Objectives: A. 1.03 Description of Work: A. Remove asbestos from areas shown at the pre-bid conference, in the drawings, and in the specifications and addenda. Bidder shall field verify types, location, quantities, and access to ACM and any other special or unusual circumstances during the recommended pre-Bid conference. The purpose of this project is to completely remove specified asbestos flooring materials from the Old Security Building at Anthony Elementary Pre-K School located in Anthony, New Mexico as shown on the drawing

Award

Educational

$80,000.00

Public - County

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
18
Bidding Soon
413
All Active Projects
159
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 10, 2022

June 10, 2022

img_map_placeholder

Multiple Locations, Anthony, NM

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.