BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Williston, Vermont. Working plans call for site work for a playground / park / athletic field.

As of June 16, 2022, no bids received. No definite date for the rebid. SCOPE of PROJECT The objective is to resurface an existing basketball court to create one (1) Basketball Court that runs width wide and create a play space of Hopscotch, Foursquare, Chalk Drawing Squares and a circle path on the other half of the area. New square basketball backboards will be needed for the basketball court. Existing poles will be reused The contractor is to supply a quote for resurfacing entire are to create a basketball court on half and a play area on the other half. Quote needs to also include new square backboards with hoop for steel nets for exiting poles that will need to be moved and install in new location. INSTALL o The contractor will be responsible for resurfacing half the area to create a basketball court with new square backboards only. o The contractor will be responsible for relocating and installing existing poles for backboards for the new direction of the basketball court. o The contractor will be responsible for attaching new square backboards to the poles. o The contractor will be responsible for resurfacing half the area to create a play are of a circle path, Hopscotch, Foursquare and Chalk Drawing areas. o The contractor will be responsible for installing all specified equipment according to manufacturer's specifications. o The contractor will be responsible for providing all labor, material, equipment, and services required for proper installation and completion of the work, whether each necessary item is mentioned or not. SITE CONDITIONS There is currently a surfaced area of 116' x 66'. It should be noted that there is water on-site, but no power utility. A site visit can be scheduled to go over design plan for a basketball court and play area. The Town anticipates issuing a letter of intent by June 17, 2022, to be followed as soon as possible by a contract. Work will be scheduled to begin after July 1, 2022 The contractor will provide and deliver to the job site all specified equipment. The contractor will also provide and deliver to the site all other required construction materials and supplies. The contractor will pay for all labor necessary to load and unload equipment, materials, and supplies.

Final Planning

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
66
Bidding Soon
1,070
All Active Projects
440
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

December 16, 2022

img_map_placeholder

541 Industrial Ave, Williston, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.