Site work, paving and outdoor lighting for a mixed-use development in Wasilla, Alaska. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Federal# / IRIS Program#: 0525019 / CFHWY00599 Region: Central Region This federally funded project will reconstruct Knik Goose Bay Road to a divided 4 lane facility from to Fairview Loop to Centaur Ave. Project work includes drainage improvements, intersection improvements, ADA improvements, grading, paving, pathways, utilities, illumination, and signalization. On the Job Trainees/Apprentices (item 645): 7 Trainee(s), 3500 Hours Engineer's Estimate Range: Between $40,000,000 and $50,000,000 AKDOT - Knik-goose Bay Rd Reconst, Phase 1 - Fairview Loop to Centaur Avenue *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1. Install temporary perimeter and erosion and sediment control measures, including utility relocation work areas, and at existing culverts as needed. 2. Perform clearing and grubbing. 3. Removal of structures and obstructions. 4. Relocate utilities. 5. Subgrade excavations and building new subgrade. 6. Construct new or widen existing embankments. 7. Foreslope, ditch and backslope stabilizations. 8. Replace and upgrade existing drainage infrastructure with new curb and gutter, field inlets, manholes and culverts. 9. Place temporary erosion control devices at new curb and gutter, field inlets, manholes and culverts. 10. Install new guardrail and end terminals. 11. Install curb ramps, and light poles. 12. Install landscaping. 13. Pave the roadways, pathways, and approaches. 14. Place traffic markings. 15. Install signs. 16. Perform signal modifications as needed. 17. Install permanent erosion control measures throughout the project as soon as possible, where needed. 18. Achieve final slope stabilization. 19. Remove temporary erosion and sediment control measures. Completion- September 30, 2024 The Engineer's Estimate is between $40,000,000 and $50,000,000

Award

Roads / Highways

$54,553,989.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

497

18

2

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
126
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

August 1, 2022

img_map_placeholder

S Knik Goose Bay Rd, Wasilla, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.