BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a mixed-use development in Detroit, Michigan. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Dove Academy of Detroit is planning for asbestos abatement at 2251 East Outer, Detroit, Michigan 48234. Dove Academy Board of Directors Purchasing Policy 6320, in compliance with Michigan law, requires competitive bids for this project. Bidders shall submit bid packages that provide the following information: 1. Company Profile: Provide an overview of the company including experience in carpet removal and replacement with vinyl plank flooring, and scope of services, materials, and product the company provides. 2. Project Team: Identify the project team manager including contact information (electronic mail and telephone). 3. Pricing: Identify pricing based on the work described in the project as the general scope of the equipment plus installation. Pricing can be in an all inclusive (turnkey) bid or on an item-by-item bid price. 4. Specifications Compliance: Attachment A must be included in the bid package. 5. Signature Page The bid package is to consist of one copy of each of the required documents. Bids submitted that lack any of the required information or documentation may be deemed incomplete and may not be considered for selection, at the discretion of the Dove Academy of Detroit Board of Directors, or its designee. Bids will be evaluated after opening and submitted to the Dove Academy of Detroit Board of Directors for consideration. Attachment A General Scope of Project RFP-Asbestos Abatement Removal of asbestos containing materials. Roughly 2400 sq ft of ACM debris removal, ACM pipe wrap removal of 680 sq ft, and ACM floor removal of 1st floor, 2nd floor, and basement of 7400 sq ft. Attachment B Specifications Compliance The bidder must agree to the following statements: Equipment: Equipment shall be new, unused, and of current model under standard production by the manufacturer. Equipment Deviation: Any deviation from the equipment listed must be noted in writing on Attachment A. Subcontracting: Services provided for this project may not be subcontracted without approval of the Academy's project manager. Suspensions and Debarment: The Contractor herby certifies that neither it nor its principles are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in any contracts with Dove Academy of Detroit or the State of Michigan. Taxes: Dove Academy of Detroit is exempt from sales tax and certain other use taxes. Charges for taxes will be deducted from any invoices before payment is made. Warranties: The Contractor warrants that all articles, materials, and goods shall be consistent with manufacturer's specifications and will be free from defects. The Academy reserves the right to return any goods that are not as warranted to the Contractor at the Contractor's expense, for either replacement with an acceptable product or credit, without additional charge to the Academy. Certification of Specifications Compliance: I certify compliance with the items listed above and further certify that the company is licensed to perform the services and provide the articles, materials, and goods stated in this RFP. Name of Company: Authorized Signature: Date: Signature Page Dove Academy of Detroit RFP- Asbestos Abatement Please use the Signature Page as the Cover Sheet for your bid proposal. In compliance with the Dove Academy of Detroit request for bid proposals, the undersigned proposes to furnish and deliver all labor, services, merchandise, and materials in accordance with the accompanying descriptions and documents. Signature confirms receipt and knowledge of Board Policy 6320. The undersigned is authorized to represent and contract for your company and certifies that your company is not on the Federal Suspension and Debarments List or Excluded Parties List. Please note if you provide a discount for quick payment, including terms.

Post-Bid

Educational

$80,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
194
Bidding Soon
2,803
All Active Projects
1,144
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 18, 2022

June 17, 2022

img_map_placeholder

2251 Outer Dr E, Detroit, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.