BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Raymore, Missouri. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project Category Code: Utility Street Construction and Excavation, Sidewalks/Curbs/Gutters, Stormwater Improvements, Street/Road Repairs Description: STREET OVERLAY Two of the streets, Heritage and Calico, have storm sewer crossings and curb to be removed and replaced prior to being milled and overlaid. 58950 sq yds of full width milling 6645 tons of 2" Type 3 Recycled overlay Tack oil is to be UltraTack, Trackless Tack NTSS-1HM manufactured by Blacklidge applied at the residual rate of .06 gal/sq yd, CAT-TAC trackless tack manufactured by Hunt Refining applied at the same rate, or other approved trackless tack oil. Paving will not begin until the tack has broken. Milled surface is to be cleaned by a vacuum sweeper immediately prior to tacking. 1597 tons of full depth patching, Type 1 Recycled asphalt. 2000 linear feet of deep crack repair on 18 streets. 10000 pounds of crack seal on two thoroughfares prior to micro surface 34980 sq yards of Type II micro surface on two thoroughfare streets; Foxridge and Lucy Webb. Re-striping two thoroughfare streets after micro surfacing. See map for specific streets. Install two, Paveway Systems, brick pattern crosswalks with 6" wide, white, thermoplastic borders. Asphalt is to be milled and overlaid 50 feet either side of the center of the crosswalks prior to the crosswalk being installed. See the crosswalk on Municipal Circle at Centerview as an example. Provide traffic control that meets MUTCD standards for all phases of the project. CURB REPLACEMENT 18000 linear feet curb removal and replacement with modified high back and roll back curb. 15 surface mount detectable warning tiles for ADA ramps. 8 ADA ramps 1000 square feet of sidewalk replacement STORM SEWER Remove and replace 11 sections of storm sewer crossing two streets (Calico and Heritage) along with the adjacent curb inlets/junction boxes. Any other questions regarding this proposal shall be submitted to Kim Quade, CPPB by email at kquade@raymore.com or by phone at (816) 892-3045. There will be no questions allowed after May 20, 2022 at 5 p.m

Final Planning

Roads / Highways

$220,000.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
49
Bidding Soon
735
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Raymore, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.