Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a fire / police facility in Taylor, Michigan. Completed plans call for the renovation of a fire / police facility.
6- new garage model 5200 r:18 insulated doors with [4] 21" x 13" port hole windows per door double end hinges with long stem 3" ball bearing rollers 50,000 cycle lift springs, solid keyed spring shaft 1 1/2" aluminum with 1" vinyl weather seal using existing 3" track 6 -Lift-Master Heavy duty - high use trolley operators 115 volt with photo eyes and electric safety edges {2} two door capability transmitters per door Adjustable timer for automatic closure. 3-Door Safety System red/green light installed on the inside of each door Removal of existing doors and operators and disposal. Install new doors and operators. General Requirements - Insurance Required - Contractors License Required - Warranty Information Required - Installation Required Questions are submitted online No Piggyback Contract No
Award
Fire / Police
$52,735.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2022
June 17, 2022
23747 Eureka Rd, Taylor, MI
Related To This Project
Taylor, MI
Bid Date: Jun 01 2022
Taylor, MI
Bid Date: Jun 08 2022
Taylor, MI
Bid Date: May 23 2022
Taylor, MI
--
Taylor, MI
Bid Date: Aug 03 2022
Taylor, MI
Bid Date: Aug 09 2022
Taylor, MI
Bid Date: Aug 08 2022
Taylor, MI
Bid Date: Jun 01 2022
Taylor, MI
Bid Date: Apr 25 2022
Taylor, MI
Bid Date: May 09 2022
Taylor, MI
Bid Date: Apr 18 2023
Taylor, MI
Bid Date: Apr 12 2022
Taylor, MI
Bid Date: Apr 12 2022
Taylor, MI
Bid Date: Apr 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
