BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a museum in Gonzales, Texas. Completed plans call for site work for a museum; and for the renovation of a museum.

**As of October 13, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Each bid proposal must be accompanied by a certified or cashier's check, or an approved bidder's bond in an amount not less than 5% of the maximum total bid, payable to the City of Gonzales, Texas without recourse, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds on the forms provided, within ten (10) working days after the award of contract. The work will be awarded under a single lump sum contract for all general construction work per Section 00 2116 and Section 00 4200. Included in the construction but not limited to will be: Misc Demolition Ventilation / Misc MEP Underground Drainage Misc Structural Repairs Substitutions: During bidding, the Architect may consider written Request for Substitutions, received at least ten (10) days prior to the original bid date and hour. Request for Substitution must be submitted in accordance with Section 01 6000. Liquidated Damages for Failure to Enter Into Contract: The successful Offeror, upon his failure or refusal to execute and deliver the contract, insurance and bonds required within 10 days after he has received notice of the acceptance of his competitive sealed proposal, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his competitive sealed proposal. A Cashier's Check or Certified Check payable without recourse to the Owner, or cash or an acceptable Surety Bid Bond, in an amount not less than five percent (5%) of the largest possible total proposal, must accompany each proposal as a guarantee that, if awarded the contract, the Offeror will promptly enter into a contract and execute bonds as outlined in the Specifications and Instructions to Offerors. A Performance Bond and Labor and Material Payment Bond in the amount of one hundred percent (100%) of the contract sum will be required, and the premiums shall be paid by the Offeror. The Owner has the right to delete, amend, add or waive any requirement set forth in the evaluation criteria above. The City of Gonzales has the right to accept or reject any bid or to waive any technicality which may be in the best interest of the City of Gonzales.

Award

Museum

$313,332.00

Public - City

Renovation, Site Work

14

13

6

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
32
Bidding Soon
2,133
All Active Projects
836
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2022

September 19, 2022

img_map_placeholder

414 Smith St, Gonzales, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.