BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Hebron, Illinois. Completed plans call for the renovation of a educational facility.

Gilbane Building Company, Construction Manager, for and acting on behalf of The Board of Education of Alden Hebron Community School District 19, is receiving lump sum proposals from interested contractors for the Alden Hebron CSD 19 Boiler Replacement Project. The school is looking to perform a boiler replacement project at the Middle / High School. This work shall include removing and replacing (2) existing boilers, including associated equipment, temperature controls, power, etc. The architect for this project is Wold Architects & Engineers. BP Description BP 23A Mechanical Work To bid this project, bidders must be qualified by Gilbane Building Company. The prequalification application is to be completed Electronically. Questions regarding the prequalification application procedure should be directed to Yvonda Royster at 312-614-3913 or yroyster@gilbaneco.com. Bid security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid is required from all bidders. Guarantee Bonds in the form of a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid will be required from the awarded Bidder. The work will be done in accordance with the Contract Documents. "Failure to Comply With the Requirements of This Invitation to Bid May Result in the Disqualification of the Bidder". This contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. The Board of Education of Alden Hebron Community School District 19 and Gilbane Building Company reserve the right to reject any or all bids. All information submitted as part of this process shall be considered public information under the State Freedom of Information Act unless specifically disclosed on the applicable information by the Bidder.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
127
Bidding Soon
2,130
All Active Projects
891
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

July 4, 2022

img_map_placeholder

Multiple Locations, Hebron, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.