BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a fire / police facility in Eagle River, Wisconsin. Completed plans call for the renovation of a fire / police facility.

The Eagle River Fire Department is accepting sealed bids for the installation of 2 new air conditioner units at the fire station at 820 E. Pine St., Eagle River, WI 54521. The units should be 3.5 ton, come complete with 13 seer condensers, case coils on furnace, reconnect the existing lineset and reconnect the existing wiring. The existing linesets need to be flushed with RX-11 Lineset Flush. The work shall be completed no later than June 15, 2022. Sealed bids can be mailed to Eagle River Fire Department, 820 E. Pine St., Eagle River, WI 54521. Any question feel free to call Jim Randall at (715) 891-7215.

Post-Bid

Fire / Police

$50,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
9
Bidding Soon
194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

June 17, 2022

Project location map

820 E Pine St, Eagle River, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.