Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 7, 2023 at 8:00 PM
Updated August 20, 2025
Renovation of a laboratory facility in Edmonton, Alberta. Completed plans call for the renovation of a laboratory facility.
Edmonton - Alberta Innovates Millwoods ARC Lab/Admin Building – Air Handling System Replacement, BioTech Lab Centre – Replace Cooling System and Controls, and Lab/Admin Building – Replace Air Handling Damper and Coil Including Insulation The intent of this Adjusted Price bid call is to solicit and receive formal offers to perform the following Work: Mechanical upgrades related to the HVAC equipment for AB Innovates at their Millwoods ARC site in Edmonton, Alberta. Included will be the following general scope of work: Project P-001065.1 – Lab and Admin Building – Air Handling System Replacement: .1 Replace existing air handling unit AH-6 with a new, custom, multizone, dual deck air-handling system. .2 Replace existing air handling unit AH-11 with a new custom air-handling system. .3 Replace the heating coil in air handling unit AH-15 and repair/modify the existing mezzanine drain pan. .4 Replace the existing supply fans serving built-up air systems PCD, VV3, and VV4 with new fanwall systems. .5 Replace the existing heating and cooling coils serving built-up air systems ICD, PCD, VV3, and VV4. .6 Replace existing hydronic pumps serving the above air systems. .7 Revise existing hydronic piping to accommodate new coils and pumps. .8 Remove redundant and abandoned piping. .9 Revise electrical distribution to accommodate the mechanical upgrades. .10 Revise existing controls. Project P-001066.1 – Biotechnology Lab Centre – Replace Cooling System and Controls: .11 Upgrade the existing process chilled water distribution system serving Biotechnology Lab Centre building C with a new chilled water storage tank. .12 Revise electrical distribution to accommodate the mechanical upgrades. Project P-004600.1 – Lab and Admin Building – Replace Air Handling Damper and Coil including Insulation: .13 Replace the existing steam heating coil with a new glycol coil in AH-12. .14 Revise existing steam distribution piping to accommodate new heating glycol coil in AH-12. .15 Revise existing hydronic piping to accommodate new coils and pumps. .16 Remove redundant and abandoned piping. .17 Revise electrical distribution to accommodate the mechanical upgrades. .18 Revise existing controls.
Award
Laboratories
$1,520,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 10, 2023
October 9, 2023
200 Karl Clark Rd NW, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Apr 05 2022
Edmonton, AB
Bid Date: Mar 19 2024
Edmonton, AB
--
Edmonton, AB
Bid Date: Aug 03 2022
Edmonton, AB
--
Edmonton, AB
Bid Date: Aug 04 2022
Edmonton, AB
Bid Date: Jul 29 2022
Edmonton, AB
--
Edmonton, AB
Bid Date: Sep 14 2023
Edmonton, AB
Bid Date: Jul 27 2022
Edmonton, AB
--
Edmonton, AB
Bid Date: Jul 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
