BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a mixed-use development in Kingston, Ontario. Completed plans call for the renovation of a conference / convention center; and educational facility.

Modernization of one (1) geared traction service elevator located in Leonard Hall and one (1) hydraulic service elevator located in Donald Gordon Conference Centre. Scope includes but is not limited to: Leonard Hall Replace controller Replace hoist motor and machine Replace car operating panels Cab finish upgrades and fixtures Compliance with current FEO requirements, New machine room HVAC (if required) Miscellaneous electrical upgrades and related work to meet TSSA compliance (grounding, disconnects, GFCI receptacles, lighting levels, guarding, etc.) Donald Gordon Conference Centre Replace Controller Replace pumping unit and hydraulic reservoir Replace car operating panels Cab finish upgrades and fixtures Compliance with current FEO requirements, New machine room HVAC (if required) Miscellaneous electrical upgrades and related work to meet TSSA compliance (grounding, disconnects, GFCI receptacles, lighting levels, guarding, etc.) Note: Specification Section 1.76 notes water infiltration in the elevator pit. This issue has been investigated by a structural engineer and doesn't pose an immediate issue. Drain and sump pump are currently installed and in working order. Queen's can have pit pumped upon request and prior to any necessary inspections with TSSA. It's assumed that infiltration issue will not affect approval process with TSSA. Elevator locations and Details: Leonard Hall - 128 Queen's Cres, Kingston, ON K7L 2T4 Single geared traction elevator, installed by Otis Elevators. 5 stops Machine Room located in 5th floor penthouse Year installed: 1959 Donald Gordon Conference Centre - 421 Union St, Kingston, ON K7L 3N6 Single hydraulic elevator, installed by Montgomery 2 stops Machine room located on basement floor Year installed: 1974 (hydraulic cylinder replaced in 2012) Intent to Respond (Appendix G) June 25, 2022 Deadline for Questions Thursday, June 9, 2022 before 4:00pm Deadline for Issuing Addenda Wednesday, June 22, 2022 Estimated Start Date: July 2022 Preferred Completion Date: August 2023

Award

Conference / Convention Centers

$447,690.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
98
Bidding Soon
892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

August 5, 2022

Project location map

Multiple Locations, Kingston, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.