Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, outdoor lighting and new construction of a mixed-use development in Miami, Florida. Completed plans call for the construction of a bridge / tunnel; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; bridge / tunnel; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.
**As of August 15, 2022, the project has not yet been awarded. The anticipated date for award is not yet determined. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes but is not limited to the following: A. Construction of the new bridge along SW 87 Ave over C-100 Canal. Broadway connecting the existing SW 87 Ave to the North and South of the proposed bridge with one travel lane, one dedicated bike lane with physical raised separation, Curb & Gutter, and sidewalk in both directions (Northbound, and Southbound). C. Roadway approach improvements to include, French Drainage, Storm Drainage System, Signing & Pavement Markings, Milling & Resurfacing guardrail installation, etc. D. Pedestrian lighting, landscaping, fencing. E. Will require close coordination with all utility stakeholders and Miami-Dade Water and Sewer Department throughout Construction. F. Particular close coordination with FPL for the relocation of the guidewire and transmission poles. G. Close coordination with Miami-Dade Water and Sewer Department will be required to keep in place the existing 48" water main along west side of proposed bridge. A. The location of work to be performed under the terms of this Contract shall be as follows: 1. From intersection SW 87 Ave & SW 164 St to intersection SW 87 Ave to SW 163 Terr B. The exact location and limits of construction are as shown on the Plans accompanying these Contract Documents.
Post-Bid
Bridges / Tunnels
$2,901,819.00
Public - County
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 6, 2022
September 19, 2022
SW 87th Ave, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: Jun 24 2022
Miami, FL
Bid Date: Aug 15 2022
Miami, FL
Bid Date: Jun 17 2022
Miami, FL
Bid Date: Jan 19 2023
Miami, FL
Bid Date: Jun 28 2022
Miami, FL
Bid Date: Aug 16 2022
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Aug 09 2022
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Jun 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.