BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and new construction of a museum in Kure Beach, North Carolina. Completed plans call civil work for a museum.

The Fort Fisher project consists of (1) complete demolition of existing visitor center and (2) constructing new 24,300 SF two-story Visitor Center and 6,337 SF PEMB Underwater Archaeology Building; Earthworks and Fortification Exhibit is an Alternate Bid Demolition of existing visitor center will include asbestos abatement & other hazardous materials Visitor Center is constructed with cast-in-place structural concrete frame, structural metal stud walls, fiber-cement rainscreen, glazed curtain wall, steel bar joists with low slope SBS modified bitumen roof, rain screens, etc. Foundations include auger piles, reinforced concrete turn-down edge SOG. HVAC system consists primarily of air-handling unit and air-cooled chiller; other systems include fire suppression, plumbing, electrical, fire alarm and communications Interior finishes include GWB partitions, ceramic tile, acoustical ceilings, carpet flooring, polished concrete floors, paint; Div. 10 specialties, operable partition; plastic laminate countertops & casework; hollow metal frames and doors (HM, FRP & wood) Underwater Archaeology Building is a pre-engineered metal building frame with insulated metal roof and wall panels on a reinforced concrete turn-down SOG, curtainwall entry; interior finishes include GWB partitions, ceramic tile, acoustical ceilings, resilient flooring, sealed & polished concrete floors, paint; Div. 10 specialties; plastic laminate countertops & casework; lab fume hood, hollow metal frames and doors (HM, FRP & wood) Site work includes erosion control measures, grading, import/export fill, storm drainage, connection to existing water, sewer & fire main; site concrete; asphalt pavement, pavement markings & signage, site furnishings; landscaping Work on existing historic fort structures is an Alternate Bid (Earthworks & Fortification Exhibit) and includes reconstruction of earthworks, gun emplacements, bombproof shelter, sally port and lunette, etc. Site is located at 1610 Fort Fisher Boulevard South, Kure Beach, NC 28449-

Post-Bid

Museum

$22,000,000.00

Public - State/Provincial

Demolition, New Construction

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
35
Bidding Soon
397
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2022

August 22, 2022

img_map_placeholder

1610 Fort Fisher Blvd S, Kure Beach, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.