BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Northfield, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

This project involves the removal and replacement of the pedestrian bridge at the east end of Bosworth Lane spanning the North Branch of the Chicago River. The project also includes the removal and replacement of the top of each concrete abutment and backwall, the removal and replacement of the timber boardwalk railing, along with improvements to the electrical utilities and lighting along the boardwalk structure. The Contractor shall complete all work in the Contract within 35 working days

Bid Results

Roads / Highways

$295,710.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
285
Bidding Soon
3,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

July 14, 2022

Project location map

Bosworth Ln, Northfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.