BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Duffield, Alberta. Completed plans call for site work for a municipal facility.

Parkland County is seeking quotations from qualified contractors to provide earthwork for the development of the Bamber East Pit (located within SW 16-53-04 W5M which is located approximately 0.5km south of Highway 16 on Range Road 44) in Parkland County. This project supports the ongoing development of the pit activity plan for the Bamber East Pit. It is Parkland County’s intent to enter into a one (1) year agreement with contract extension options for the subsequent phases. Contract extension for Phase 2 and Phase 3 is at the discretion of Parkland County and is subject to satisfactory performance from the Contractor, and Parkland County’s acceptance of pricing. Bamber East Development Phase 1 (2022) Topsoil and Subsoil removal from MS5 and undisturbed area within MS4 and Placed in MS3 on existing partially reclaimed areas (Approximately 10,000m3) Overburden Removal from MS4 and MS5 and Placed in Fill Area in MS3 and MS4. Haul Road to remain in place (Approximately 200,000m3) Provisional Item #1: Movement of Elimination Sand Material Located within Processing area and MS4, to be placed within fill areas (Approximately 30,000m3) Phase 2 (TBD) Topsoil and Subsoil removal from MS6 and MS7 and Placed in MS4 on existing partially reclaimed areas (Approximately 10,000m3) Overburden Removal from MS6 and MS7 and Placed in MS5 (Approximately 200,000m3) Provisional Item #2: Movement and Placement of Overburden, Subsoil, and Topsoil stockpiles within MS1 to expose remaining Pit Run (Approximately 20,000m3) Phase 3 (TBD) Topsoil and Subsoil removal from MS1 and MS2 stockpiles, and placed in MS6, MS7 and MS2 on existing partially reclaimed areas (Approximately 20,000m3) Provisional Item #3: Recontouring of site to encourage positive drainage based on activity plan (Approximately 20,000m3) The schedule for Phase 2 and Phase 3 is based on the depletion of pit run material in the previous phase mining sequence.

Award

Municipal

$813,500.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
8
Bidding Soon
223
All Active Projects
76
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2022

August 22, 2022

img_map_placeholder

Multiple Locations, Duffield, AB

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.