Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Buckley, Washington. Completed plans call for site work for a water / sewer project.
** This project has been awarded to R. L. Alia Co Inc in the amount of $2,244,669. ** This Contract provides for five schedules of work. Schedule A - Collins Road Water Mains, 720 LF of 12-inch ductile iron on Collins Road. Schedule B - Sanitary Sewer Mains, 2,800 LF of 8-inch, 350 LF of 12-inch, 120 LF of 18-inch, and 320 LF of 24-inch in three alleys, Park Avenue, Hatch Street, and Ryan Road. Schedule C - Storm Drains, Glacier Meadows Storm Outfall and 855 LF of 8-inch in two alleys. Schedule D -Road Restoration, Collins Road, Levesque Road, Naches Street, and Spiketon Road. Schedule E - Heather Lane Improvements, 110 LF of 8-inch water ramps at Whitmore Way All work will be done in accordance with the attached Contract Plans, these Special Provisions, and the Standard Specifications. The Work shall be physically complete within 1.20 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and. Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Washington. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond, payable to the "City of Buckley" and in an amount of not less than five percent (5%) of the total Proposal amount. Contract questions shall be directed only to the office of the Project Engineer. Financing of the Project has been provided by 'City of Buckley, Washington. The City of Buckley expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in anv Proposal.
Award
Water / Sewer
$2,244,669.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
June 21, 2022
October 3, 2022
February 6, 2023
Multiple Locations, Buckley, WA
Related To This Project
Buckley, WA
Bid Date: Aug 16 2022
Buckley, WA
Bid Date: Sep 06 2022
Buckley, WA
--
Buckley, WA
Bid Date: Feb 28 2023
Buckley, WA
Bid Date: Feb 24 2023
Buckley, WA
Bid Date: Mar 21 2023
Buckley, WA
Bid Date: Mar 15 2023
Buckley, WA
Bid Date: May 14 2024
Buckley, WA
Bid Date: Jun 15 2022
Buckley, WA
Bid Date: Mar 08 2023
Buckley, WA
Bid Date: Jul 06 2022
Buckley, WA
Bid Date: May 27 2022
Buckley, WA
Bid Date: Mar 08 2023
Buckley, WA
Bid Date: Mar 10 2023
Buckley, WA
Bid Date: May 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--