BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2022 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a pre-engineered storage facility in Eugene, Oregon. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

EWEB wishes to procure a prefabricated control building for their rebuild of Currin Substation. This building will be fully integrated with medium-voltage metal clad switchgear and is to come equipped with full station service, substation protection and control panels, and communications equipment.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$500,000.00

Public - City

New Construction, Site Work

1

1

95

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
17
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

August 10, 2022

Project location map

To Be Determined, Eugene, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.