Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 7, 2025 at 8:00 PM
Updated June 8, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Ben Lomond, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Replace bridges and install MGS. 05-SCr-9-9-13.6,15.5 Contract No. 05-1H4704 05-SCr-9-9-13.6,15.5 Project ID 0516000078 Federal-Aid Project ACBFST-S009(030)E In Santa Cruz County Near Boulder Creek At San Lorenzo River Bridge And At Kings Creek Bridge The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-12, C-10. 745 Working Days Submit your bid with bidder's security equal to at least 10 percent of the bid. CADOT - Replace Bridges and Install MGS The Project is located at two locations on State Route 9 (SR-9) in Santa Cruz County near the community of Boulder Creek in the State of California (Exhibit A). Location 1 is located at the San Lorenzo River Bridge (No. 36-0052) at post-mile (PM) 13.6, Latitude 37.1329, Longitude - 122.1254. Location 2 is located at the Kings Creek Bridge (No. 36-0045) PM 15.5, Latitude 37.1428, Longitude -122.1320. Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests. The Project is limited to the removal and replacement of two previously existing bridges over the San Lorenzo River and Kings Creek along SR-9. The removal and replacement of the two bridges will occur in phases over three years between 2023 and 2025. The two replacement bridges will clear span the active channel and floodplain at both Project locations (Exhibit A) Bids must be on a unit price basis. Complete the work, excluding plant establishment work, within 495 working days. Complete the work, including plant establishment work, within 745 working days. Complete the plant establishment work within 250 working days. The estimated cost of the project is $12,500,000 Solicitation no: 05160000781
Post-Bid
Bridges / Tunnels
$12,500,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2025
August 4, 2025
CA-9, Ben Lomond, CA
Related To This Project
Ben Lomond, CA
Bid Date: Sep 27 2021
Ben Lomond, CA
Bid Date: May 26 2021
Ben Lomond, CA
Bid Date: Jan 20 2022
Ben Lomond, CA
Bid Date: Apr 25 2024
Ben Lomond, CA
Bid Date: Mar 06 2025
Ben Lomond, CA
--
Ben Lomond, CA
Bid Date: Oct 27 2022
Watsonville, CA
Bid Date: Mar 21 2024
Castroville, CA
--
Los Angeles, CA
Bid Date: Apr 21 2022
El Cajon, CA
Bid Date: Jun 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
