Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Ben Lomond, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replace bridges and install MGS. 05-SCr-9-9-13.6,15.5 Contract No. 05-1H4704 05-SCr-9-9-13.6,15.5 Project ID 0516000078 Federal-Aid Project ACBFST-S009(030)E In Santa Cruz County Near Boulder Creek At San Lorenzo River Bridge And At Kings Creek Bridge The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-12, C-10. 745 Working Days Submit your bid with bidder's security equal to at least 10 percent of the bid. CADOT - Replace Bridges and Install MGS The Project is located at two locations on State Route 9 (SR-9) in Santa Cruz County near the community of Boulder Creek in the State of California (Exhibit A). Location 1 is located at the San Lorenzo River Bridge (No. 36-0052) at post-mile (PM) 13.6, Latitude 37.1329, Longitude - 122.1254. Location 2 is located at the Kings Creek Bridge (No. 36-0045) PM 15.5, Latitude 37.1428, Longitude -122.1320. Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests. The Project is limited to the removal and replacement of two previously existing bridges over the San Lorenzo River and Kings Creek along SR-9. The removal and replacement of the two bridges will occur in phases over three years between 2023 and 2025. The two replacement bridges will clear span the active channel and floodplain at both Project locations (Exhibit A) Bids must be on a unit price basis. Complete the work, excluding plant establishment work, within 495 working days. Complete the work, including plant establishment work, within 745 working days. Complete the plant establishment work within 250 working days. The estimated cost of the project is $12,500,000 Solicitation no: 05160000781

Post-Bid

Bridges / Tunnels

$12,500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

231

37

116

8

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
159
Bidding Soon
2,400
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

August 4, 2025

Project location map

CA-9, Ben Lomond, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.