EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 15, 2022 at 8:00 PM

Updated January 27, 2024

Site work and renovation of a civil project in Stafford Township, New Jersey. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Bids 2.Project Description-Contract No. SD1903 SWPCF Potable Water Distribution System and Service Water Improvements, the Work, includes, but is not necessarily limited to the removal and replacement of potable water and service water distribution systems with new C-900 PVC and HDPE piping systems including all valves, hydrants, fittings and hardware. Work also includes the removal and replacement of a portion of the potable water service within the Operations and Maintenance Building, Potable Water Building, and Effluent Pump Station. The site is located at 150 Cedar Run Dock Road, West Creek, Stafford Township, New Jersey, 08092, as shown on the drawings. Provide the name of the individual at the firm that is requesting the Bidding Documents to whom all correspondence generated during the bid period may be addressed (i.e. Item No. 6 below). Bidding Documents will be shipped only if the requesting party includes their overnight shipping service number. Please copy the Engineering and Construction Department Contract Administrator Linda Salussolia (lsalussolia@ocua.com) on any e-mails or correspondence you may send to the Construction Manager or the Authority. The Authority is doing everything within its capabilities to protect employees' health, safety and welfare, while at the same time continuing to provide the level of services expected by our participants. We are committed to ensuring the workplace is safe and healthy for all employees. As a potential Bidder for this Project, the Authority asks that you screen any proposed attendees that you may have attend any site visit. Limit attendance to one attendee from your firm at the most. It is also asked of you, to perform a specific screening of your employee(s) whom may be assigned to attend these meetings out of an abundance of caution and in the interest of public health. The following questions are recommended to be asked, prior to these meetings: *Are you having flu-like symptoms, such as fever, cough, or shortness of breath *In the last 14 days have you traveled to a high-risk area for transmission of COVID-19 *Have you been in close contact with someone confirmed or is being evaluated for COVID-19 *Are you now or have you been under quarantine If any response to these questions is affirmative, please do not allow this employee to attend any pre-bid meeting or site visit for an Authority Project. You may want to review the Centers for Disease Control and Prevention web page for guidance in this regard. 6.Addenda-Notice of revisions or addenda to advertisement or bid documents shall be in accordance with N.J.S.A.40A:11-23(a) and N.J.S.A.40A:11-23(c). 7.Bidders are required to comply with the requirements of N.J.S.A.10:5-31et seq. and N.J.A.C.17:27 et seq. equal employment opportunities; N.J.S.A.52:25-24.2 corporate, LLC, and/or partnership ownership; N.J.S.A.52:32-44 business registration of public contracts; and the "Public Works Contractor Registration Act," N.J.S.A.34:11-56.48. 8.Local Public Contract Requirements-The New Jersey Department of Labor and Workforce Development Prevailing Wage Determination for the Work is Confirmation No.77659. 9.New Jersey Election Law Enforcement Commission-Bidders will be required to comply with the requirements of the New Jersey Election Law Enforcement Commission pursuant to N.J.S.A.19:44A-20.4 and N.J.S.A.19:44A-20.27. 10.Surety Bonding a.Bidders are required to comply with N.J.S.A.40A:11-21, 40A:11-22, and 40A:11-23.2 and furnish all guarantees and certificates with the bid, in accordance with applicable laws. b.In accordance with N.J.A.C.7:22-3.17(g) and N.J.A.C.7:22-4.17(g), all applicable surety bonds required in connection with the advertisement and award of building contracts or sub-agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570-Surety Companies Acceptable on Federal Bonds), incorporated herein by reference. Copies of this document may be obtained from the United States Department of Treasury, Financial Management Service or their web site. 11.Requests for Interpretation-All questions or inquiries concerning the Bidding Documents or the Work shall be submitted in writing to the Engineer. 12.AwardAward subject to any agreed extension of the period for holding Bids, the Owner will act within sixty (60) days after the date of Bid opening to award the Contract lowest responsible bidder, reject all Bids or take any other appropriate action. The Owner expressly reserves the right to reject Bids, waive any minor informalities or non-material exceptions, re-advertise for Bids or withhold the award for any reason the Owner determines, in accordance with the applicable law. The award of this contract is subject to the 10-day review period provided by N.J.S.A.40:20-71.3. 13.Prevailing WagesThe New Jersey Prevailing Wage Act, N.J.S.A.34:11-56.27 et seq. is hereby made a part of the Contract. The Contractor's execution of the Agreement is its guarantee that neither it nor any subcontractors it has employed to perform the Work are listed or are on record in the Office of Commissioner, Department of Labor and Workforce Development, as one who has failed to pay prevailing wages in accordance with applicable law.

Award

Water / Sewer

$2,050,023.00

Public - County

Renovation, Site Work

15

18

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Protection of Adjacent Construction, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Site Remediation, Physical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Sound, Vibration, and Seismic Control
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
105
Bidding Soon
2,599
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

September 5, 2022

img_map_placeholder

150 Cedar Run Dock Rd, Stafford Township, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.