Published August 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in South Burlington, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

All questions about the meaning or intent of the bid documents must be received by 5:00 PM on July 14, 2022 Please contact Stephen Haas, shaas@hoyletanner.com, 603-460- 5168 or Donna Akerley, dakerley@hoyletanner.com, 603-460-4934 for meeting information at least five (5) days prior to the scheduled bid opening. The 5-day lead time is required in case the bid opening time changes. Each bidder must deposit with their bid, security in the amount of 5% of the bid in the form and subject to the conditions provided in the INSTRUCTIONS TO BIDDERS. Bids submitted by bidders that exceed their Maximum Dollar Capacity Rating (MDCR) as determined by the Vermont Agency of Transportation on an annual basis may be considered non-responsive. LOCATION: The Dorset Street Pavement Rehabilitation project limits will include approximately 2,000 linear feet of Dorset Street from the south side of the Garden Street intersection and ending at the south side of the Aspen Drive intersection. TYPE OF CONSTRUCTION: Work to be performed under this project includes: Pavement rehabilitation is anticipated to consist of a 2" cold plane, leveling course, and a 2" Superpave wearing course. Geometric layout and profile improvements are not anticipated. Other improvements will include catch basin repairs & grate adjustments, driveway apron repair including curb removal, curb ramp improvements, and durable pavement markings (recessed polyurea for longitudinal lines and Type A tape for symbols and crosswalks). Existing curbing, sidewalk, and median islands are anticipated to remain, unless otherwise noted. Replacement of traffic signal loop detectors at Aspen Drive will not be required, as the signal is currently set to Max recall and new detection equipment will be part of a future project. CONTRACT COMPLETION DATE: The Contract shall be completed on or before September 23, 2022. ENGINEERS ESTIMATE: For this Proposal the Engineers Estimate falls between $650,000 and $750,000. PREBID CONFERENCE: A pre-bid conference will not be held for this project. STANDARD SPECIFICATIONS: This contract is governed by the Vermont Agency of Transportation ("VTrans") 2018 Standard Specifications for Construction. QUESTIONS: During the advertisement phase of this project all questions shall be addressed solely to Stephen Haas, shaas@hoyletanner.com, 603-460-5168. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$841,394.00

Public - City

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
201
Bidding Soon
2,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2022

August 19, 2022

Project location map

Dorset St, South Burlington, VT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.