Published July 25, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Woodside, California. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of July 35, 2022, bids were rejected. No definite date for the rebid.** The work will include the furnishing of all labor, materials, equipment and services necessary or required to install a pathway, timber retaining wall, drainage improve- ments, roadway signs and striping on Glenwood Avenue in the Town of Woodside. Project Schedule: All work shall be completed within 50 working days from Notice to Proceed. 1.06 Bid Preparation Cost: Bidders are solely responsible for the cost of preparing their Bids. 1.07 Reservation of Rights: Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids. ARTICLE 2 LEGAL REQUIREMENTS 2.01 Required Contractor's License(s): A California "A" contractor's license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. 2.02 Required Contractor and Subcontractor Registration A. Owner shall accept Bids only from Bidders that (along with all Subcontractors listed in Document 00 4330, Subcontractor List) are currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. B. Subject to Labor Code Sections 1771.1(c) and (d), any Bid not complying with paragraph 2.02A above shall be returned and not considered; provided that if Bidder is a joint venture (Business Professions Code Section 7029.1) or if federal funds are involved in the Contract (Labor Code Section 1771.1(a)), Owner may accept a non-complying Bid provided that Bidder and all listed Subcontractors are registered at the time of Contract award. 2.03 N/A 2.04 N/A 2.05 Substitution of Securities: Owner will permit the successful bidder to substitute securities for any retention monies withheld to ensure performance of the contract. Should the contactor opt for this option please contact the owner to obtain the form. 2.06 Prevailing Wage Laws: The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. Upon request, Owner will make available copies to any interested party. Also, the successful Bidder shall post the applicable prevailing wage rates at the Site. 2.07 Prevailing Wage Monitoring: This Project is subject to prevailing wage compliance monitoring and enforcement by the Department of Industrial Relations.

Final Planning

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
63
Bidding Soon
1,602
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

January 25, 2023

img_map_placeholder

Glenwood Ave, Woodside, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.