BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Lakeport, California. Completed plans call for site work for a 90,000-square-foot road / highway; and for paving for a road / highway.

The intersection of State Route 29 ("SR 29") and Lakeport Boulevard is one of three access points to the City and is the closest to the City Center. The adjacent intersection of Bevins Street is one of the most impacted intersections in the City. These intersections serve a large portion of the undeveloped portion of Lakeport on the west side of SR 29. These include the development of the Lakeport Hub commercial center (90,000 square feet) off of Parallel and Todd Roads to the southwest and a residential mixed-use project (163 units) off of Parallel Drive to the northwest. To the east of SR 29 there is under development four new low-income housing developments (152 units) and the proposed new courthouse at the southwest corner of Lakeport Boulevard and Larrecou Lane which would also affect these intersections. The purpose of the PSR is to examine the alternatives to the current status of the intersections of Lakeport Boulevard with the southbound SR 29 ramps (west of Highway 29), the northbound SR 29 ramps east side of SR 29, and the Bevins/SR 29 intersection. Previous studies have indicated installing a traffic signal at these locations and signal alternatives need to be evaluated as part of the PSR. The suggested improvement has been traffic signals which are considered unsatisfactory by the City. The completed project study report shall comply with all current Caltrans Project Development Procedures Manual. The report will be divided into sections, one for each location (southbound ramps, northbound ramps and Bevins. The following report information is based on the City's understanding of the project. However, the City is unfamiliar with this type of PSR as the City has never undertaken a project which involves a Caltrans highway. The consultant shall comply with the concept of the Scope of Work and also satisfy all Caltrans requirements for the PSR. The consultant shall provide a detailed scope of services which includes all of the elements contained herein and any others required to fulfill Caltrans requirements for a Project Study Report as referenced. The City may change the scope of services unilaterally. If alternatives or changes to the scope of services are proposed by City, proposed Consultants or Contractors will be asked to provide details of changes, rationale for changes and associated fee categories if applicable. The schedule of activities related to this contract is as follows: Activity Date RFP Mail-out June 14, 2022 Written Question Submittal Deadline July 6, 2022 Proposal Submittal Deadline July 27, 2022 Presentation/Interview (if needed) August 3, 2022 Tentative Contract Award August 10, 2022 Tentative Contract Effective Date August 24, 2022 Responses received within the prescribed deadline become the property of City of Lakeport and all rights to the contents therein become those of City of Lakeport. Questions regarding this Request for Proposals MUST be submitted IN WRITING. Written questions should include the individual's name, the name of the firm (if applicable), address, telephone number, and e-mail, no later than July 6, 2022. Questions should be directed to: Jenni Byers, Community Development Director City of Lakeport 225 Park Street Lakeport, CA 95453 E-mail: jbyers@cityoflakeport.com Telephone (707) 263-5613 Questions and answers will be provided in the form of an addendum to this RFP, and will be posted by July 13, 2022, on City of Lakeports electronically. The City Manager shall consider any matter appealed during a scheduled hearing, within thirty days of receipt. The decision of the City Manager shall be final with respect to the matters of fact. All disputes and/or appeals must be submitted to: Kevin Ingram, City Manager City of Lakeport 225 Park Street Lakeport, CA 95453 Telephone (707) 263-5613 City of Lakeport may reject any proposal if it is conditional, incomplete, or contains irregularities. City of Lakeport may waive an immaterial deviation in a proposal. Waiver of an immaterial deviation shall in no way modify the Request for Proposals documents or excuse the respondent from full compliance with the contract requirements if the proposer is awarded the contract.

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
15
Bidding Soon
348
All Active Projects
168
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2022

August 26, 2022

img_map_placeholder

Lakeport Boulevard and State Route 29, Lakeport, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.