Published March 20, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a multi-residential development in Sleepy Hollow, New York. Completed plans call for site work for a multi-residential development.

Remove approximately 315 linear feet of existing bulkhead, timber dolphins, and impacted upland area for the installation of a new rip rap revetment and relocation and restoration of the upland sidewalk and site features. All related work and restoration in accordance with Sleepy Hollow requirements. No bids will be received or considered after the time stated above. A bid bond, certified check or bank check in the amount of 5% of bid must accompany the bid proposal. The Board of Trustees of the Village of Sleepy Hollow reserves the right to accept or reject any or all bids and to waive any informalities at their discretion, and to award contracts in a manner deemed to be in the best interests of the Village of Sleepy Hollow even if such award is to other than the lowest bidder. It is intended that, whenever possible, positive recommendations will be presented to the Board of Trustees so that an awarding of the bid can be made at the next scheduled meeting. Your cooperation in adhering to the procedures outlined above and contained within the specifications would be greatly appreciated.

Post-Bid

Multi-Residential

$70,000.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Construction Aids, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Cast Decks and Underlayment, Concrete Topping, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Timber Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Marine Construction and Equipment, Marine Specialties, Buoys
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
558
Active Projects
326
Bidding Soon
4,804
All Active Projects
2,298
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2023

May 19, 2023

img_map_placeholder

115 River St, Sleepy Hollow, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ichabod's Landing Bulkhead Reconstruction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.