BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 27, 2025

Site work and new construction of a fire / police facility in Fort Saskatchewan, Alberta. Completed plans call for the construction of a 30,000-square-foot, two-story above grade fire / police facility.

The Helmuth Ritter Fire Station will be located at 151 Southridge Boulevard. The lot was purchased by the City in 2014. Southridge Boulevard abuts the lot to the north and Southview Way to the west. Deep Utilities are stubbed to the property from Southview Way and shallow utilities run along Southridge Boulevard. The IPD team will Validate concept three from the Fire Hall Scope Study (Appendix F). Concept three is a two storey, 2,786 square meter facility which includes an Emergency Coordination Centre (ECC), training grounds and a heritage room where the City can display a historic fire truck that has been rebuilt and honor the 120-year history of the Fort Saskatchewan Fire Department (FSFD). Below is a summary of the scope of work for concept three: Two new park lots with approximately 60 parking stalls Security access and fencing around staff parking and training grounds Two new accesses to Southview Way and Southridge Blvd Apparatus Bay with auxiliary spaces (gear storage, gear wash, workshop, SCBA washer/dryer, hose drying, compressor room/SCBA compressor, radio room) 8 dorm rooms Platoon Chief office with Platoon Chief dorm Captain office with Captain dorm Fitness area Common area and kitchen Computer room Janitor and laundry rooms Washrooms and shower spaces Locker rooms Classroom Offices Board room and breakout rooms Reception Storage Heritage room Training grounds with training tower Second floor dedicated ECC space with offices, breakout rooms, washrooms, kitchen, boardroom, server room, and command centre. Emergency generator Flashing lights on Southridge Blvd Station alerting Deep utilities City fibre optics to facility Documents can be obtained from https://fortsask.bonfirehub.ca/opportunities/99182 Question Deadline 11/21/2025 at 12:00 PM MT Questions concerning this project may be directed to Joey Farebrother Senior Engineering Coordinator City of Fort Saskatchewan Telephone: (780) 992-6296 10005 - 102 Street Email: jfarebrother@fortsask.ca Fort Saskatchewan, Alberta T8L 2C5

Post-Bid

Fire / Police

$24,500,000.00

Public - City

New Construction, Site Work

37

11

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
25
Bidding Soon
557
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2025

April 1, 2027

Project location map

151 Southridge Blvd, Fort Saskatchewan, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.