BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of an educational facility in Paw Paw, Michigan. Completed plans call for the renovation of a educational facility.

Project has been awarded but award amount was not confirmed. Furnish all equipment, materials, cable, labor, and engineering services to provide complete and professionally installed systems in working order and in accordance with good engineering practice. Coordinate with Paw Paw Schools District Technology Coordinator to ensure all structural rigging points and backing required to install and deploy Audio-Video equipment is provided and positioned correctly. • Coordinate with Paw Paw Schools District Technology Coordinator to ensure the necessary accommodations are made related to the facility networks and internet (e.g. VLAN requirements, network topology, security, et al.) • Coordinate with Paw Paw Schools District Technology Coordinator as required to ensure timely progress and successful integration of the sound systems. • Install, pull, and terminate all wire and cable as required for a successful installation. • Furnish any additional items, not specifically mentioned herein, to meet good engineering practice, without claim for additional payment. Such items may include, but are not limited to, hardware, transformers, terminal strips, connectors, resistors, capacitors, blank cover plates, and other Audio devices for proper installation, interface, isolation, and/or gain structure. • Furnish additional items not specifically mentioned herein as required to provide a fully functioning sound system. • Furnish shop drawings and receive Paw Paw Schools District Technology Coordinator approval prior to procurement, fabrication, and installation. • Perform initial adjustments, verification tests, and final adjustments. • Assist the Paw Paw Schools District Technology Coordinator in the Acceptance Testing of the systems. Refer to section 3.5 for detailed Acceptance Testing requirements and expectations. • Provide training of the owner's staff on all sound systems items listed. • Provide system documentation including copies of all relevant as-built documentation and equipment manuals. • Provide maintenance and warranty services for the specified period from the date of acceptance. • Note that the work scope under this section does not include the materials or installation for the AC power system except for the fabrication required within the equipment racks and where specifically called out in the contract documents. • Note that the scope of work described in this specification includes materials or installation hardware for the successful completion of this sound system specification. This includes conduit, couplings, hangers, supports, pull boxes, pull box lids, pull string, back boxes, lids/covers/blank plates for all AV boxes, and ladder tray.

Award

Educational

$40,000.00

Public - City

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
120
Bidding Soon
1,340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2022

August 5, 2022

Project location map

30609 Red Arrow Hwy, Paw Paw, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.