BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2023 at 7:00 PM

Updated May 16, 2024

Site work, paving and outdoor lighting for a road / highway in South Gate, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

Engineer's Estimated Cost: $2,000,000 to $2,500,000. The Boulevard Project is an important project as it provided congestion relief, enhanced safety and addressed deferred maintenance on this important corridor. Construction of the first phase of the project has been completed in 2019. The second phase project will continue to make improvements on the following segments: 1. Segment 1 - a 1.4-mile, Firestone Boulevard between Alameda Street and California Avenue. 2. Segment 2 - a 1.1-mile, Firestone Boulevard between California Avenue and Annetta Avenue. The Phase II improvements includes bus turn outs, street widening, pedestrian lighting, bus shelters, concrete bus pads, pavement rehabilitation, traffic signal and street light modifications, and other ADA improvements needed to complete the project. Pre-Qualification for Bidders: Not Required The project will make improvements on Firestone Boulevard, from Alameda Street to Annetta Avenue. Improvements will include 2 bus turn outs, pedestrian lighting, 5 bus shelters, pavement rehabilitation, traffic signal modifications at Calden Avenue and California Avenue, street light modifications, and ADA improvements. The scope of work has been re-organized, and the construction of the project is out to bid again. Bids are scheduled to open on Monday January 9, 2023. Construction is planned to begin in early 2023. The Boulevard Project is an important project as it provided congestion relief, enhanced safety and addressed deferred maintenance on this important corridor. Construction of the first phase of the project has been completed in 2019. The second phase project will continue to make improvements on the following segments: 1. Segment 1 - a 1.4-mile, Firestone Boulevard between Alameda Street and California Avenue. 2. Segment 2 - a 1.1-mile, Firestone Boulevard between California Avenue and Annetta Avenue. The Phase II improvements includes bus turn outs, street widening, pedestrian lighting, bus shelters, pavement rehabilitation, traffic signal and street light modifications, and other ADA improvements needed to complete the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,117,454.00

Public - City

Outdoor Lighting, Paving, Site Work

31

8

2

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
575
Active Projects
163
Bidding Soon
3,825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2023

February 8, 2023

Project location map

Multiple Locations, South Gate, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.