BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a road / highway in South Gate, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

Engineer's Estimated Cost: $2,000,000 to $2,500,000. The Boulevard Project is an important project as it provided congestion relief, enhanced safety and addressed deferred maintenance on this important corridor. Construction of the first phase of the project has been completed in 2019. The second phase project will continue to make improvements on the following segments: 1. Segment 1 - a 1.4-mile, Firestone Boulevard between Alameda Street and California Avenue. 2. Segment 2 - a 1.1-mile, Firestone Boulevard between California Avenue and Annetta Avenue. The Phase II improvements includes bus turn outs, street widening, pedestrian lighting, bus shelters, concrete bus pads, pavement rehabilitation, traffic signal and street light modifications, and other ADA improvements needed to complete the project. Pre-Qualification for Bidders: Not Required The project will make improvements on Firestone Boulevard, from Alameda Street to Annetta Avenue. Improvements will include 2 bus turn outs, pedestrian lighting, 5 bus shelters, pavement rehabilitation, traffic signal modifications at Calden Avenue and California Avenue, street light modifications, and ADA improvements. The scope of work has been re-organized, and the construction of the project is out to bid again. Bids are scheduled to open on Monday January 9, 2023. Construction is planned to begin in early 2023. The Boulevard Project is an important project as it provided congestion relief, enhanced safety and addressed deferred maintenance on this important corridor. Construction of the first phase of the project has been completed in 2019. The second phase project will continue to make improvements on the following segments: 1. Segment 1 - a 1.4-mile, Firestone Boulevard between Alameda Street and California Avenue. 2. Segment 2 - a 1.1-mile, Firestone Boulevard between California Avenue and Annetta Avenue. The Phase II improvements includes bus turn outs, street widening, pedestrian lighting, bus shelters, pavement rehabilitation, traffic signal and street light modifications, and other ADA improvements needed to complete the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,117,454.00

Public - City

Outdoor Lighting, Paving, Site Work

31

8

2

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
236
Bidding Soon
3,771
All Active Projects
1,715
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 9, 2023

February 8, 2023

October 18, 2023

img_map_placeholder

Multiple Locations, South Gate, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.