Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Huntersville, North Carolina. Conceptual plans call for site work for a playground / park / athletic field.
All inquiries/questions regarding this RFQ must be directed to Michael Jaycocks by e-mail must reach his office by Friday, 12:00 noon, July 8, 2022 [at least fourteen days before the Qualifications submittal due date] in order to be considered for a response. To ensure fair consideration and equal access to information for all Consultants, the questions and answers will be sent via e-mail to each Consultant who has submitted a "Notification of Interest." Any other contact in reference to this RFQ, prior to the time an award decision has been made, will result in disqualification of the firm. Oral answers will not be authoritative PURPOSE & PROJECT DESCRIPTION The Town of Huntersville is accepting Request for Qualifications (RFQ) for consulting services to perform preliminary planning, engineering, design, and construction administration for the installation of a splashpad in one of the Town's parks. The consult will provide preliminary planning for two different sites for the Town to consider. The consulting services will include scoping of the project, splashpad amenities, and associated site amenities to include drainage, storm water, construction documentation, permitting with local and state agencies, bidding assistance, construction administration, project closeout, and post-occupancy problem solving. The request for a splashpad was one of the most requested park amenities in the 2020 Huntersville Park and Recreation Master Plan. The Town is considering two park sites for its first splashpad. North Mecklenburg Park and Waymer Park. North Mecklenburg Park is a 98-acre District Park and Waymer Park is a 13-acre Neighborhood Park SCOPE OF SERVICES The Town is seeking qualified, experienced consultant teams ("Consultant") to provide design and construction administration services for the Town's first splashpad. The project will include investigating two sites for consideration. The following is a minimal list of project requirements: 2.1. SITE VISITS a. One site visit with Town Staff to review project parameters. 2.2. SCHEMATIC DESIGN b. Meet with Town Staff on a regular basis to finalize project scope, review design opportunities and constraints, and implement the project. c. Obtain a field survey for the areas of work, which shall include property boundaries (if needed), topography, built features, utilities, wetlands, stream buffers, other natural features, and trees if needed. d. Conduct code and zoning research on safety, function, transportation, and accessibility. Identify regulatory agencies and permits required for the project. e. Assess programming needs with staff and any potential partners. f. Review current splash pads nearby and research changes in manufacturers and construction methods to allow staff to make a proper material selection based on programming, cost, and maintainability. g. Develop conceptual options for two site and field layout with preliminary cost estimate including construction contingency of 10% for evaluation with staff and other project partners. Attend staff review meetings and finalize preliminary concept. h. Prepare schematic drawings for review. i. Attend staff design review meetings and provide written response to staff for review and comments. 2.3 CONSTRUCTION DOCUMENTATION SERVICES a. i. Prepare construction drawings and specifications (project manual); ii. Reviews by the staff project team of both the drawings and project manual at 60% completion, 90% completion, and at 100% completion; and iv. The design team will meet with the staff project team to discuss and review comments at the 60%, and 90% stages of completion. c. Coordinate all adjacent park features surrounding scope site, such as, but not limited to, walkways, fencing, and drainage. d. Coordinate all affected utilities such as water, sewer, and electrical. 2.4 CONSTRUCTION ADMINISTRATION a. Construction Observation - Includes attending pre-construction conference; attending monthly progress meetings; attend other meetings as needed; review and approve all submittals and RFI's; approval of pay applications; review of change order; attend punch-list inspections at both substantial and final completion; and addressing design questions (RFI's) that arise during construction. In addition, Consultant shall keep minutes of all meetings b. As-Built - At the completion of the construction project, provide a digital set (AutoCAD) and one sealed set of PDF's of as-built plans. c. Management Plan - At completion of construction project, compile all product information including all warranties and maintenance procedures into a concise document for Town Staff to use.
Conceptual
Playgrounds / Parks / Athletic Fields
$550,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2023
Multiple Locations, Huntersville, NC
Related To This Project
Huntersville, NC
--
Huntersville, NC
--
Huntersville, NC
Bid Date: Jul 07 2021
Huntersville, NC
Bid Date: Aug 25 2021
Huntersville, NC
Bid Date: Aug 31 2020
Huntersville, NC
Bid Date: Aug 28 2020
Huntersville, NC
Bid Date: Jun 27 2022
Huntersville, NC
Bid Date: Jul 22 2022
Huntersville, NC
Bid Date: Apr 21 2022
Huntersville, NC
Bid Date: Mar 31 2022
Huntersville, NC
--
Huntersville, NC
Bid Date: Apr 25 2022
Huntersville, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.