BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 6, 2022 at 8:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in Downers Grove, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

To furnish the goods and/or services identified in the specifications document. or The Village of Downers Grove is accepting proposals from qualified firms to furnish the goods and/or services identified in the specifications document. The Wisconsin Avenue Drainage Improvements Project shall generally consist of the following: -Installation of soil erosion and sediment control practices, as called out on the plans. -Full depth pavement removal. -Sidewalk, and driveway removal as called out on plans. -Construction of a new proposed storm sewer system along Wisconsin Avenue along with driveway culvert replacement and cross road culvert replacement. -Re-shaping the ditches on the north and south side of the road, where specified on the plans. -Installation of new full depth pavement, driveway aprons, grind and overlay. -All other collateral work such as erosion control maintenance Note: All prospective bidders/respondents are hereby cautioned not to contact any member of the village of downers grove staff or officials other than the specified contact person. The Village Council reserves the right to accept or reject any and all bids/proposals, to waive technicalities and to accept or reject any item of any bid/proposal.

Award

Water / Sewer

$769,689.00

Public - City

Paving, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
244
Bidding Soon
3,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

September 14, 2022

Project location map

Wisconsin Ave, Downers Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.