Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Baker, Louisiana. Working plans call for site work for a water / sewer project.

*Owner rejected all bids. Project will rebid at a later date. The City of Baker, LA is seeking proposals to clear certain waterways within the City's boundaries related to the movement of water through drainage systems for flood mitigation. We appreciate your interest in providing these services and look forward to receiving your proposal (RFP). The City has identified the most significant ditches/canals within its boundaries that play a major role in drainage during water events that mitigate potential flooding of properties and streets. This request covers one of these identified waterways for which a more detailed scope of work is provided in Section 3. The City of Baker, LA is seeking proposals to clear certain waterways within the City's boundaries related to the movement of water through drainage systems for flood mitigation. Receipt of written inquiries/clarifications Jul 21, 2022 Response to written inquiries/clarifications Jul 22, 2022 Award Letter Submitted Aug 1, 2022 Prepare pre-construction video to identify the condition of the waterway and private property adjoining the waterway; - Provide video to appropriate City employees to indicate extent of work required and to initiate notice to proceed with work identified; -Identify access points for which Rights of Entry/Hold Harmless agreements may be required and coordinate with appropriate City employees to obtain appropriate signatures from property owners; - Clear brush and debris within the waterway and transport off-site as specified; - Remove any fallen trees lying within the waterway and transport off-site as specified; -Cut down any trees growing in the waterway replacing with a material approved by the City's Public Works Department for purposes of maintaining erosion control; - Excavate any material blocking the entrance or exit of all outfalls, pipe crossings, etc. which may be spread on-site along existing borders, if possible; - Backfill any eroded areas with rip rap, broken concrete or any other stabilized material approved by the City's Public Works Department; and - Repair areas of access or existing properties damaged through this process Execution of Contract Aug 1, 2022 Preferred Contract Completion Oct 31, 202

Final Planning

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
121
Bidding Soon
1,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

October 1, 2022

Project location map

Multiple Locations, Baker, LA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed