Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, remodeling and renovation of a water / sewer project in Middleburg, Florida. Completed plans call for the remodel of a water / sewer project.
Scope The Contractor shall perform the Work complete, in place and make ready for construction of a new aerator, new chemical feed lines, rehabilitating the ground storage tank (GST), and new GST influent raw water piping for the Ridaught WTP to provide a fully functional GST system as described in the Contract Documents. The work and includes all labor, materials, equipment, permits, and incidentals necessary to perform, but is not limited to, the following: 1. Mobilization/Demobilization, General Requirements, Bonds and Insurance. 2. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. 3. Site Work a. Site Preparation b. Erosion Control c. Salvage: Prior to demolition of equipment or facilities, the Contractor shall coordinate with the Owner on any Owner designated equipment identified to be salvaged. Contractor shall move the identified equipment and/or materials to the warehouse located on-site. d. Demolition as shown on the drawings. e. Site restoration including sodding and other restoration. Filling of demolished old pressure sustaining valve vault area as appropriate. Contractor agrees to restore as necessary, any systems that might be impacted during construction. Restoration of the project site to pre-construction condition. 4. Structural Work a. Rehabilitate the existing GST as shown on the drawings. b. Install new guardrails around the perimeter of the GST roof. c. Install new aerator curb and plug all existing roof penetrations no longer in service. d. Install new valve assembly equipment pad. 5. Mechanical Work a. Install a new Cascade Aerator with a 3,800 gallon per minute (GPM) capacity. b. Install a new valve assembly. c. Install two new chemical feed connections, stainless steel spool piece pipe, and two new pressure gauges. d. Install new ductile iron influent mechanical piping to the GST's new aerators shown in the drawing. e. Replace bypass piping from the GST's new aerator. f. Install new hose bib and wash down station g. Cut and install new potable water 3/4 -inch yard piping to hose wash down station. 6. Electrical Work a. Install new conduit to the new task light as shown on the drawings. b. Demolish existing GST electrical conduit and lighting and terminate wiring at side of GST in a newly installed stainless steel junction box as shown on the drawings. B. Electrical, Instrumentation and Control work shall be constructed in accordance with CCUA Water Treatment Plant Standards, drawings, and specifications to provide a functional and integrated new electrical system. C. Conducting all necessary testing and start-up. D. All materials, methods of construction, and standards must be in accordance with the AUTHORITY's approved material manual, specifications, and details (latest version). E. Substantial Completion: To satisfy the definition of Substantial Completion, all on-site Work including punch list items required by the Contract have been completed to where the Contractor can vacate the site and only those elements of submittal and closeout nature remain for the attainment of Final Completion and as previously described.
Post-Bid
Water / Sewer
$1,000,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2022
August 30, 2022
3020 Chief Ridaught Trail, Middleburg, FL
Related To This Project
Middleburg, FL
--
Middleburg, FL
Bid Date: May 10 2019
Middleburg, FL
Bid Date: Aug 04 2022
Middleburg, FL
Bid Date: Feb 07 2023
Middleburg, FL
Bid Date: Oct 05 2018
Middleburg, FL
--
Middleburg, FL
--
Middleburg, FL
Bid Date: Aug 05 2022
Middleburg, FL
Bid Date: May 27 2022
Middleburg, FL
Bid Date: Jul 25 2022
Middleburg, FL
Bid Date: Jul 20 2022
Middleburg, FL
Bid Date: Jul 07 2022
Middleburg, FL
Bid Date: Dec 05 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.