BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a military facility in McConnell AFB, Kansas. Completed plans call for the renovation of a military facility.

Construction Contract for Project No. PRQE 212481, Add Offices to Bldg. 65 for FSS,MSG & Wing HQ, McConnell AFB, KS 67221. Work w ill be in accordance w ith the contract, plans, and technical specifications. This action is being solicited on a 100% Small Business Set Aside basis. The North American Industry Classification (NAICS) Code is 236220 - Commercial and Institutional Building Construction and the size standard for small business is $39.5M average annual revenue for the past three years. Project magnitude is betw een $250,000.00 and $500,000.00. Persons intending on submitting a BID should attend the Site Visit. Failure to submit a bid on all items shall result in rejection of the bid. Solicitation information, notices and amendments w ill be posted at https://sam.gov/. Aw ard w ill be made to the responsible bidder w hose bid conforms to the invitation for bids and is most advantageous to the Government considering only price. Funds are presently available for this acquisition. All questions for the pre-bid conference must be submitted by 08 August 2022 via email to darin.brun@us.af.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1 Reconfiguration of various rooms in building 65. CLIN 001 Work includes adding/removing walls, ceilings, doors, and flooring. Work will require relocating existing above the ceiling Ground Source Heat pumps and associated ductwork, piping, controls, and electrical. CLIN 001 also includes Testing, Adjusting, and Balancing of the entire building's HVAC systems which includes the Heat Pumps, Energy Recovery Units, and Geothermal Hydronic Water Pumps. Cleaning all supply and return ductwork for the heat pumps and energy recovery units and also includes replacing all existing thermostats to match the current KSANG base standard which includes the capability to monitor room humidity. CLIN 002 includes all work required to replace the existing energy recovery unit in the North Mechanical Room with a new Dedicated Outdoor Air System, DOAS, Unit. CLIN 003 includes all work required to replace the existing energy recovery unit in the South Mechanical Room with a new Dedicated Outdoor Air System, DOAS, Unit.

Post-Bid

Military

$500,000.00

Public - Federal

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
30
Bidding Soon
438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 3, 2022

Project location map

To Be Determined, McConnell AFB, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.