BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Milltown, Wisconsin. Completed plans call for site work for a water / sewer project.

Boat ramp replacement at Half Moon Lake consisting of removal and replacement of existing concrete boat ramp, sheet pile and dewatering, supply and install new dock, riprap, and restoration. The Work includes: Trenching, backfilling and compacting Surface replacement Concrete work Asphalt Boat dock Steel sheet pile Excavation and grading

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
134
Bidding Soon
1,388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

September 17, 2022

Project location map

200th Ave, Milltown, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.