BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Port Angeles, Washington. Completed plans call for site work for a water / sewer project.

The project includes the installation of approximately 2,200 lineal feet of 8 and 10 Cured-in-Place Pipe (CIPP) liner and restoration/repair of 5 sewer manholes located at Shane Park on the North side of West 8th Street between East E and East G Street. Contractor will be responsible for managing sanitary sewer flows during the CIPP lining and manhole restoration using a bypass system, storage (Vacuum Truck) or other approved method. Partial road closures will be allowed during active work hours with traffic control provided by the bidder. The Engineers estimate for the Main Bid $230,000 - $270,000. The Engineers estimate for the Additive Bid is $40,000 - $60,000. The time of completion (performance period) is 30 working days. The City of Port Angeles in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The City of Port Angeles is an equal opportunity and affirmative action employer. Small, minority- and women-owned businesses are encouraged to submit bids. All work performed on the project will be subject to the State of Washington prevailing wage rates. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$270,000.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2022

September 2, 2022

Project location map

Multiple Locations, Port Angeles, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.