Site work, paving and new construction of a mixed-use development in Findlay, Ohio. Completed plans call for site work for a playground / park / athletic field; for the construction of a service station / car wash facility; service station / car wash facility; sidewalk / parking lot; for paving for a service station / car wash facility; pre-engineered storage facility; and pre-engineered storage facility.

As of September 30, 2022. Bids were rejected. Said work consisting of a single-story pre-engineered metal building bus maintenance facility with two service bays administrative support spaces and mezzanine storage space. Work also includes parking and adjacent athletic fields. Scope- Work includes all work necessary to complete single story bus maintenance facility and site work along with other Work indicated in the Contract Documents. Furnish and install all of the items to make a complete working system unless otherwise noted. General Contractor is responsible for coordinating work noted as "Owner Provided/Owner Installed". Project Location: Liberty-Benton Maintenance Garage, 9190 County Road 9, Findlay, OH 45840 Bids shall be submitted on the form furnished with each set of bid documents or on a photographic copy of that form. Each bid shall be accompanied by a bid guarantee meeting requirements of Section 153.54 of the Ohio Revised Code. Said guarantee may be in the form of a bond (ORC 153.571) or a certified check, cashiers check, or letter of credit meeting requirements of 153.54. Prevailing wage rates do not apply. Bids received after the time and date set for bid opening will be returned to the bidder unopened. The said Board of Education reserves the right to waive informalities, and to accept or reject any and all, or parts of any and all bids. No bids may be withdrawn for at least 60 days after the scheduled closing time for receipt of bids. Start of Work at Project Site - March 20, 2023 Substantial Completion - September 8, 2023 Final Completion - September 29, 2023 Helms & Sons Excavating Inc is requesting bids by end of the day on March 21, 2023.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$1,900,000.00

Public - County

New Construction, Paving, Site Work

17

11

21

2

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
42
Bidding Soon
763
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

March 31, 2023

img_map_placeholder

9190 Co Rd 9, Findlay, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.