BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Lancaster, Ohio. Working plans call for the renovation of a water / sewer project.

Addition of Water Treatment Equipment in the Mechanical Room of the Fairfield County Jail located at 345 Lincoln Avenue, Lancaster, Ohio. The proposed Watts One-Flow treatment equipment will be added to the domestic hot water system in the upper mechanical room above the inmate area, and will involve relocating existing boilers and piping to accommodate the new configuration. Each bid must be submitted in a sealed envelope, accompanied by the bid bond described in the ITB, and clearly marked on the outside of the envelope Bid for Water Treatment Equipment . The Facilities Manager, County Administrator, Design Consultant, and County Commissioners will evaluate all bids submitted to determine the lowest and best bid. The Fairfield County Commissioners reserve the right to reject any and all bids in response to this Invitation to Bid (ITB), and to waive any irregularities, nonconformities, or noncompliance with the terms of this ITB. The Fairfield County Board of Commissioners is an Equal Opportunity Employer. Bidders are required to certify equal employment opportunity and drug-free workplace, among other certifications required in the bid documents. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The final contract completion date shall be 90 calendar days from the date of Notice to Proceed, to final close-out documents and a final payment request is submitted. Liquidated damages will be assessed at a rate of $500 per day to the contractor for late completion and occupancy of the new Work area by the Owner, unless an approved contract extension is granted.

Final Planning

Water / Sewer

$62,521.00

Public - County

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
45
Bidding Soon
768
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2022

September 12, 2022

img_map_placeholder

345 Lincoln Ave, Lancaster, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.