Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in John Day, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.
Proposals shall be clearly marked "West 7TH Street 7 Project" along with time and date of bid opening and shall be delivered or mailed and received before the above hour and date to City of John Day, 450 East Main Street, John Day, OR 97845, attention Corum Ketchum, City Manager. Work is to commence within 10 days of the date of the Notice to Proceed and shall be completed by November 30th, 2022. The work consists of the following construction: Schedule 'A' - Mobilization, Temporary Traffic Control, Erosion and Pollution Control, Clearing and Grubbing, Sawcut AC, AC Removal, 1460 CYs of Embankment, 800 Ton 3/4 "-0" Aggregate Base Rock, 900 Ton of 1 1/2 "-0" Aggregate Base Rock, 620 ton of Level 2 - 1/2 " Dense -HMAC, 2026 LF of Standard Curb, 5619 SF of Sidewalk, 1600 SF of 4" & 6" Concrete slabs, ADA Ramps, Concrete Driveway Approaches, Concrete Speed Table, Conduit Installation, 975 SF of Block Landscaping Wall, Infiltration Basins, 10" & 12" Storm Drain Pipe Installation, and (6) Catch Basins. Additional work that will be awarded on a separate bid schedule consists of the following: Schedule 'B' - Mobilization, Compact and Shape Existing 3/4 "-0" Base Rock, 44 Ton of 1/4 "-0" Paver Base Sand, 5850 SF of Pavers. All proposals shall be made on Proposal Forms, accompanied by completed Bid Bond, Bidder's Certification Statements, Insurance Requirement Form, Employee Drug Test Certification Form, and First Tier Subcontractor Form (within two hours of bid closing). Once awarded a one hundred percent (100%) performance bond and one hundred percent (100%) payment bond will be required to guarantee the faithful performance of the contract. Bidders need to be aware that City of John Day's office hours are M-Th 8:00am-4:00pm and that overnight delivery service is not always available in this area. The Contract is for public work subject to ORS 279C.800 to 279C.870. The City of John Day reserves the right to reject any or all bids if it is in the public interest to do so, may reject any bid not in compliance with all bidding procedures and requirements, to postpone the award for 30 days, to delete items from the proposal, and to award the contract to the lowest possible bidder per each schedule listed.
Bid Results
Roads / Highways
$1,030,769.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 18, 2022
August 29, 2022
NE 7th St, John Day, OR
Related To This Project
John Day, OR
Bid Date: Aug 15 2019
John Day, OR
Bid Date: Aug 15 2019
John Day, OR
Bid Date: Mar 31 2020
John Day, OR
Bid Date: Apr 07 2022
John Day, OR
Bid Date: Mar 09 2023
John Day, OR
Bid Date: Feb 28 2023
John Day, OR
--
John Day, OR
Bid Date: Apr 27 2023
John Day, OR
Bid Date: Sep 07 2022
John Day, OR
Bid Date: Jul 19 2022
John Day, OR
Bid Date: Nov 15 2022
John Day, OR
Bid Date: Oct 05 2022
Portland, OR
Bid Date: Sep 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.